Down with the Pavement

On February 10, 2012, in Uncategorized, by admin

At last, the haul road is complete. The pavement is finally in place and the TRC team is ready to haul material off-site. For all the future construction engineers, here is how you pave a road:

Step 1: Stain the future road

Haul Road.

Haul Road.

Step 2:  Pour asphalt

Haul Road.

Haul Road.

Step 3:  Compress asphalt.

Haul Road.

Haul Road.

Step 4:  Pour another layer of asphalt

Haul Road.

Haul Road.

Step 5:  Use proper machines when pouring asphalt

Haul Road.

Haul Road.

Step 6:  Brand new road – ready to go!

Haul Road.

Haul Road.