Unit Drawing Type Drawing Number Drawing Name
1 Architectural A-100-A TURBINE & SWITCHGEAR ROOMS FLOOR PLAN & DETAILS
1 Architectural A-101-A MECHANICAL ROOM AT ELEV. 445'-0" PLAN & DETAILS
1 Architectural A-102-B CONTROL WING - ELEV. 475'-6" FLOOR PLAN & SCHEDULES
1 Architectural A-103-A CONTROL ROOM CEILING DETAILS VENTILATOR DETAILS
1 Architectural A-104-A TURBINE BUILDING ROOF PLAN & DETAILS
1 Architectural A-105-A EXTERIOR ELEVATIONS NORTH & SOUTH
1 Architectural A-106-A EXTERIOR ELEVATIONS EAST & WEST
1 Architectural A-107-B TURBINE ROOM WALL SECTIONS & DETAILS
1 Architectural A-108-A TURBINE ROOM WALL & PILING DETAILS
1 Architectural A-109-A CONTROL ROOM WING SECTIONS & DETAILS WINDOWS & DOORS
1 Architectural A-110-B CONTROL WING SECTIONS & DETAILS
1 Architectural A-111-A TURBINE BAY & CONTROL WING CROSS SECTIONS
1 Architectural A-112-A CONTROL ROOM WING INTERIOR ELEVATIONS AT ELEV. 475'-6"
1 Architectural A-113-A CONTROL WING LOBBY & STAIRWAY PLAN & DETAILS
1 Architectural A-114-A CONTROL WING LOBBY & STAIRWAY SECTIONS & DETAILS
1 Architectural A-115-A CONTROL WING LOBBY & STAIRWAT SECTIONS & DETAILS
1 Architectural A-116-A ELEVATOR & AIR INTAKE DETAILS
1 Architectural A-120-A TURBINE BUILDING EMBLEM DETAIL & PAINT COLOR CODE
1 Concrete C-100-A TURBINE BUILDING & BOILER PILING PLAN
1 Concrete C-101-C TURBINE BUILDING MAT PLAN
1 Concrete C-102-C TURBINE BUILDING BASEMENT PLAN
1 Concrete C-103-C TURBINE BIULDING EQUIPMENT
1 Concrete C-104-D TURBINE BIULDING PLAN - ELEVATION 445.0' @ R.R. SIDING, COLUMN PILASTER, & DETAILS
1 Concrete C-105-D CONTROL ROOM WING MAT PLAN -WALL ELEVATIONS AND DETAILS
1 Concrete C-106-A CONTROL ROOOM WING ENTRANCE PLAN & DETAILS
1 Concrete C-107-D CONTROL ROOM FLOOR PLANS, SECTION, & DETAILS
1 Concrete C-108-B TURBINE BUILDING WALL ELEVATIONS
1 Concrete C-109-B TURBINE BUILDING ELEVATOR & VENTILATOR SHAFT PLAN & DETAILS
1 Concrete C-110-B TURBINE BUILDING VENTILATION DUCT, DOOR, & WALL DETAILS
1 Concrete C-111-A TURBINE BUILDING B.F.P. TRENCH & SUPPORT DETAILS
1 Concrete C-113-B TURBINE BUILDING MAT SECTIONS
1 Concrete C-114-B TURBINE BUILDING MAT SECTIONS
1 Concrete C-115-E TURBO-GENERATOR FOUNDATION CONCRETE OUTLINE & ANCHOR BOLT LOCATION PLAN
1 Concrete C-116-A TURBO-GENERATOR FOUNDATION REINFORCING PLAN AT OPERATING FLOOR LEVEL
1 Concrete C-117-B TURBO-GENERATOR FOUNDATION CONCRETE SECTIONS
1 Concrete C-118-B TURBO-GENERATOR FOUNDATION CONCRETE SECTIONS & DETAILS
1 Concrete C-119-C TURBO-GENERATOR FOUNDATION CONCRETE SECTION & DETAILS
1 Concrete C-120-B TURBO-GENERATOR FOUNDATION CONCRETE SECTIONS
1 Concrete C-121-A TURBO-GENERATOR FOUNDATION CONCRETE ELEVATIONS
1 Concrete C-122-B TURBO-GENERATOR FOUNDATION STEEL -- MISCELLANEOUS DETAILS
1 Concrete C-123-C INTAKE STRUCTURE PLANS, ELEVATION & DETAILS
1 Concrete C-124-D INTAKE STRUCTURE ELEVATIONS & DETAILS
1 Concrete C-125-B INTAKE STRUCTURE STAIR DETIALS, COVER PLATES, & HOOD DETAILS
1 Concrete C-126-A INTAKE STRUCTURE WINGWALL
1 Concrete C-127-B DISCHARGE STRUCTURE PLAN AND DETAILS
1 Concrete C-128-D HEADWALL, CHANNEL & JUNCTION BOX FOR 66"ø SRCP HEADWALL & INLET FOR 15"ø SRCP PLAN & DETAILS
1 Concrete C-129-B BOILER FOOTINGS & SLAB PLANS, SECTIONS & DETAILS
1 Concrete C-130-E PLAN OF SWITCHYARD AND TRANSMFORMER AREA
1 Concrete C-131-C DETAILS OF SWITCHYARD AND TRANSFORMER FOUNDATIONS
1 Concrete C-132-A FUEL OIL PUMP HOUSE PLANS, ELEVATIONS AND SECTIONS
1 Concrete C-133-B FUEL OIL PUMP HOUSE PLAN AND DETAILS
1 Concrete C-134-A FUEL OIL PUMP HOUSE DETAILS
1 Concrete C-135-B ELECTRICAL MAN HOLES AND HAND HOLES PLAN, SECTIONS & DETAILS
1 Concrete C-136-F MISC. DRAINAGE STRUCTURES SUPPORTS FOR CFWH-12, 14, & 15 DETAILS
1 Concrete C-137-D WATER TREATMENT AREA MISCELLANEOUS CONCRETE FOUNDATIONS
1 Concrete C-138-A FUEL OIL STORAGE TANK PLANS, SECTIONS & DETAILS
1 Concrete C-139-D MISCELLANEOUS PIPE TRENCH & SUPPORT DETAILS
1 Concrete C-140-A TRANSMISSION TOWER FOUNDATIONS
1 Electrical E-132-E YARD DUCT RUNS & MAIN GROUNDING SYSTEM PLAN
1 Electrical E-135-J TURBINE AREA-MEZZANINE FLOOR ELECTRICAL PLAN
1 Electrical E-136-H BASEMENT FLOOR ELECTRICAL PLAN
1 Electrical E-139-G CONTROL ROOM & BOILER OPERATING LEVEL ELECTRICAL PLAN
1 Electrical E-140-L MECHANICAL EQUIPMENT ROOM & BOILER GRADE ELECTRICAL PLAN
1 Electrical E-154-F INTAKE STRUCTURE ELECTRICAL PLAN & DETAILS
1 Electrical E-155-J WATER TREATING PLAN & DETAILS
1 Electrical E-156-C FUEL OIL STORAGE PLAN & DETAILS
1 Electrical E-157-F SWITCHYARD & TRANSFORMER AREA ELECTRICAL PLAN
1 Electrical E-160-G SWITCHYARD & TRANSFORMER AREA CONDUIT LAYOUT DETAILS
1 Electrical E-161-C MANHOLE DETAILS
1 Electrical E-164-C STREET LIGHTING PLAN & DETAILS
1 General G-100-C SITE LAYOUT PLAN
1 General G-101-B SITE LAYOUT PLAN & DETAILS
1 General G-102-C SITE SECTIONS, TYPICAL SECTIONS
1 General G-103-H PARKING AREA, WATER TREATMENT AREA, AND BOILER AREA PLAN & DETAILS
1 General G-104-C INTAKE STRUCTURE AREA PLAN AND DETAILS
1 General G-105-A SOIL BORINGS PLAN & PROFILES
1 General G-106-P FIRE PROTECTION SYSTEM PLAN AND DETAILS
1 General G-107-B 60"ø CIRCULATING COOLING WATER LINE, 66"ø HOLLY STREET STORM SEW. PLAN AND PROFILE
1 General M-114-B KEY PIPING PLAN
1 Miscellaneous M-100-B INDEX OF DRAWINGS
1 Miscellaneous M-109-D EQUIPMENT SCHEDULE
1 Miscellaneous M-115-A EQUIPMENT LAYOUT ELEVATION 429'-0" PLAN
1 Miscellaneous M-116-C EQUIPMENT LAYOUT ELEVATION 445'-0" PLAN
1 Miscellaneous M-117-A EQUIPMENT LAYOUT ELEVATION 459'-0" PLAN
1 Miscellaneous M-118-A EQUIPMENT LAYOUT ELEVATION 475'-6" PLAN
1 Miscellaneous M-119-A EQUIPMENT LAYOUT ELEVATION 535'-9" PLAN
1 Piping P-101-M TURBO-GENERATOR BLDG. PLAN AT ELEVATION 429'-0"
1 Piping P-102-K TURBO-GENERATOR BLDG. PLAN AT ELEVATION 445'-0"
1 Piping P-103-C TURBO-GENERATOR BLDG. PLAN AT ELEVATION 459'-0"
1 Piping P-104-M BOILER AREA PLAN AT ELEVATION 445'-0"
1 Piping P-105-J BOILER AREA PLAN AT ELEVATION 475'-6"
1 Piping P-106-D BOILER AREA PLAN AT ELEVATION 525'-9"
1 Piping P-107-D BOILER AREA PLAN AT ELEVATION 556'-6"
1 Piping P-108-Q DEMINERALIZATION AREA PLAN AT ELEVATION 445'-0"
1 Piping P-109-T UNLOADING AREA AND FUEL GAS PRESSURE REG. STATION PLAN AT ELEVATION 445'-0"
1 Piping P-110-C INTAKE STRUCTURE PLAN ELEVATION 445'-0"
1 Piping P-111-W FUEL OIL STORAGE AREA PLAN AT ELEV. 445'-0"
1 Piping P-112-P EMERGENCY GAS STORAGE TANKS PLAN AT EL. 445'-0" AND SECTIONS
1 Piping P-114-L TURBO GENERATOR BLDG. SECTION 'A-A', LOOKING WEST
1 Piping P-115-G TURBO-GENERATOR BLDG. SECTION "B-B" LOOKING WEST
1 Piping P-116-H TURBO-GENERATOR BLDG. SECTION "C-C" LOOKING WEST
1 Piping P-117-G TURBO-GENERATOR BLDG. SECTION "D-D" LOOKING WEST
1 Piping P-118-E TURBO-GENERATOR BLDG. SECTION "E-E" LOOKING NORTH
1 Piping P-119-H TURBO-GENERATOR BLDG. SECTION "F-F" LOOKING NORTH
1 Piping P-120-G TURBO-GENERATOR BLDG. SECTION "G-G" LOOKING NORTH
1 Piping P-121-E TURBO-GENERATOR BLDG. SECTION "H-H" LOOKING NORTH
1 Piping P-122-B TURBO-GENERATOR BLDG. TURBINE PIPING PLAN EL. 459'-0" AND SECTIONS "J-J", "K-K", "L-L"
1 Piping P-123-B TURBO-GENERATOR BLDG. TURBINE PIPING PLAN EL. 456'-0" AND SECTIONS "M-M", "N-N"
1 Piping P-124-F TURBO-GENERATOR BLDG. MISC.SECTIONS & DETAILS
1 Piping P-125-F BOILER AREA SECTION "AA-AA" LOOKING EAST
1 Piping P-126-J BOILER AREA SECTION "BB-BB" LOOKING WEST
1 Piping P-127-H BOILER AREA SECTION "CC-CC" LOOKING WEST
1 Piping P-128-K BOILER AREA SECTION "DD-DD" LOOKING SOUTH
1 Piping P-129-G BOILER AREA SECTION "EE-EE" LOOKING NORTH
1 Piping P-130-E MECHANICAL & CONTROL WING SECTIONS FF-FF GG-GG HH-HH & WW-WW
1 Piping P-131-N DEMINERALIZER AREA SECTIONS JJ-JJ & KK-KK
1 Piping P-132-H DEMINERALIZER AREA SECTIONS LL-LL & MM-MM
1 Piping P-133-B INTAKE STRUCTURE SECTION "PP-PP" AND MISC. DETAILS
1 Piping P-134-T FUEL OIL STORAGE AREA SECTIONS "QQ-QQ", "RR-RR", "SS-SS", "TT-TT", "UU-UU" & MISC. DETAILS
1 Piping P-135-T UNLOADING AREA AND FUEL GAS PRESSURE REG. STATION SECTIONS SS-SS, "TT-TT", "UU-UU", "VV-VV", "WW-WW" & "XX-XX"
1 Piping P-136-C BOILER AREA SECTIONS UU-UU, VV-VV, WW-WW MISC. DETAILS
1 Plumbing A-117-B CONTROL ROOM PLAN & DETAILS
1 Plumbing A-118-A MECHANICAL EQUIPT. RM. EL.445 PLAN & DETAILS
1 Structural S-100-A TURBINE BUILDING ROOF FRAMING PLAN AND ELEVATIONS
1 Structural S-101-A TURBINE BUILDING SECTION & DETAILS
1 Structural S-102-A TURBINE BUILDING CRANE RUNWAY FRAMING PLAN AND DETAILS
1 Structural S-103-A TURBINE BUILDING SECTIONS
1 Structural S-104-A TURBINE BUILDING DETAILS
1 Structural S-105-A CONTROL ROOM WING STEEL FRAMING PLANS, ELEVATION & DETAILS
1 Structural S-106-A CONTROL ROOM WING STEEL FRAMING PLANS, ELEVATIONS & PLAN
1 Structural S-107-B CONTROL ROOM WING STEEL FRAMING SECTIONS & DETAILS
1 Structural S-108-B ELEVATOR STRUCTURE PLAN AND ELEVATIONS
1 Structural S-109-A ELEVATOR STRUCTURE SECTIONS AND DETAILS
1 Structural S-110-A TURBINE BUILDING OPERATING FLOOR STEEL FRAMING PLAN & DETAILS
1 Structural S-111-A TURBINE BUILDING MEZZANINE FLOOR-STEEL FRAMING PLAN & DETAILS
1 Structural S-112-A SWITCHGEAR ROOM FLOOR FRAMING PLAN & FLOOR FRAMING DETAILS
1 Structural S-113-A TURBINE BUILDING STAIR NO.1 & NO.2 PLANS, SECTIONS, ELEVATION & DETAILS
1 Structural S-114-A TURBINE BUILDING STAIR NO.3, NO.4, NO.5, NO.6, NO.7 PLANS, SECTIONS, & DETAILS
1 Structural S-115-B TURBINE BUILDING OPERATING FLOOR PLAN
1 Structural S-116-A TURBINE BUILDING - MEZZANINE FLOOR PLAN
1 Structural S-118-C TURBINE BUILDING SHEETPILE BULKHEAD SUPPORT
1 Structural S-119-A BOILER STRUCTURE DEAERATOR SUPPORT AND PLATFORMS - FRAMING PLANS ELEVATIONS AND SECTIONS
1 Structural S-119-B FLOOR DRAIN SYSTEMS TURBINE BLDG. BASEMENT & BOILER AREA
1 Structural S-120-D MISCELLANEOUS STEEL STRUCTURES & DETAILS
1 Structural S-121-B MISCELLANEOUS STEEL
1 Structural S-126-B UNIT 1 MAIN GAS REGULATOR ENCLOSURE FRAMING PLAN
1 Structural S-127-B UNIT 1 MAIN GAS REGULATOR ENCLOSURE FLOOR PLAN
1 Structural S-128-B UNIT 1 MAIN GAS REGULATOR ENCLOSURE DETAILS
1 Structural S-129-B UNIT 1 FORCED DRAFT FAN ENCLOSURE TYPICL DETAILS
1 Structural S-130-A UNIT 1 MAIN GAS REGULATOR ENCLOSURE ELEVATIONS
1 Structural S-131-B UNIT 1 FORCED DRAFT FAN ENCLOSURE FLOOR PLAN
1 Structural S-132-B UNIT 1 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL PLAN
1 Structural S-133-A UNIT 1 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL PLAN
1 Structural S-134-A UNIT 1 FORCED DRAFT FAN ENCLOSURE SECTION
1 Structural S-135-B UNIT 1 FORCED DRAFT FAN ENCLOSURE SECTION
1 Structural S-136-A UNIT 1 FORCED DRAFT FAN ENCLOSURE SECTION
1 Structural S-137-A UNIT 1 FORCED DRAFT FAN ENCLOSURE WALL SECTIONS
1 Structural S-138-B UNIT 1 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL DETAILS
1 Structural S-139-B UNIT 1 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL DRAINS
1 Structural S-177-C TUBINE BUILDING CRANE ACCESS LADDER AND PLATFORM ARRANGEMENT AND DETAILS
1 Ventilation V-101-A BASEMENT DUCTWORK & FUEL OIL PUMP HOUSE
1 Ventilation V-102-A MECH. & SWITCHINGEAR RMS PLAN & SECTIONS
1 Ventilation V-103-A OFFICE & CONTROL ROOM A.C. PLAN & SECTIONS
1 Ventilation V-104-B EQUIPMENT SCHEDULE AND MISC. DETAILS
1 Ventilation V-105-B FANS AND FILTERS PLANS & SECTIONS
2 Architectural A-201-B TURBINE ROOM FLOOR PLAN ELEVATION 459'-0"
2 Architectural A-202-B TURBINE ROOM NORTH & WEST ELEVATIONS
2 Architectural A-203-B TURBINE ROOM SOUTH ELEVATION & ENTRANCE ROOF DETAILS
2 Architectural A-204-A TURBINE ROOM LONGITUDINAL SECTION
2 Architectural A-205-B TURBINE BUILDING CROSS SECTION & DETAILS
2 Architectural A-206-A TURBINE ROOM WALL SECTIONS & DETAILS
2 Architectural A-207-A TURBINE BUILDING ROOF PLAN & DETAILS
2 Architectural A-208-A TURBINE ROOM WALL & PILING FLASHING DET'S.
2 Architectural A-209-A CONTROL WING DOOR & STAIRS DETAILS
2 Architectural A-210-C TURBINE BUILDING MEZZANINE TOILET PLAN & PLUMBING DETAILS
2 Architectural A-211-A TURBINE BUILDING AIR INTAKE STRUCTURE PLAN SECTION & DETAILS
2 Architectural A-212-A CONTROL ROOM CEILING DETAILS VENTILATOR DETAILS
2 Architectural A-213-A BOILER STRUCTURE SOUND REDUCTION PANELS AT F.D. FAN PLATFORM
2 Architectural A-214-A MAINTENANCE BUILDING FLOOR PLAN & VENTILATION DETAILS
2 Architectural A-215-A MAINTENANCE BUILDING ELEVATIONS & CROSS SECTION
2 Architectural A-216-A MAINTENANCE BUILDING INTERIOR ELEVATIONS SECTION & DETAILS
2 Architectural A-217-A MAINTENANCE BUILDING PLUMBING PLAN & DETAILS
2 Architectural A-218-A BOILER AREA CHEMICAL FEED STORAGE BUILDINGS
2 Architectural A-219-A FLOOR DRAIN SYSTEMS TURBINE BLDG., BASEMENT & AREA
2 Concrete C-201-A TURBINE BUILDING & BOILER PILE PLAN
2 Concrete C-202-A TURBINE BUILDING MAT PLAN EL. 421.00'
2 Concrete C-203-A TURBINE BUILDING NORTH WALL
2 Concrete C-204-A TURBINE BUILDING SOUTH WALL
2 Concrete C-205-A TURBINE BUILDING WEST ELEVATION
2 Concrete C-206-A TURBINE BUILDING BASEMENT FLOOR PLAN
2 Concrete C-207-A TURBINE BUILDING VENTILATOR SHAFT PLAN & DETAILS
2 Concrete C-208-A TURBINE BUILDING BASEMENT FOUNDATION DETAILS
2 Concrete C-209-A TURBINE BUILDING BASEMENT SECTIONS & DETAILS
2 Concrete C-210-A TURBO-GENERATOR FOUNDATION PLAN OPERATING FLOOR LEVEL
2 Concrete C-211-A TURBO-GENERATOR FOUNDATION REINFORCING PLAN AT OPERATING FLOOR LEVEL
2 Concrete C-212-A TURBO-GENERATOR FOUNDATION LONGITUDINAL ELEVATIONS
2 Concrete C-213-A TURBO-GENERATOR FOUNDATION LONGITUDINAL SECTION A-A
2 Concrete C-214-A TURBO-GENERATOR FOUNDATION TRANSVERSE SECTIONS B-B & C-C
2 Concrete C-215-A TURBO-GENERATOR FOUNDATION TRANSVERSE SECTIONS D-D & EAST ELEVATION
2 Concrete C-216-A TURBO-GENERATOR FOUNDATION WEST ELEVATION AND MISC. SECTIONS & DETAILS
2 Concrete C-217-A TURBO-GENERATOR FOUNDATION SECTIONAL PLAN E-E BASEMENT FLOOR LEVEL
2 Concrete C-218-A TURBO-GENERATOR FOUNDATION MISCELLANEOUS STEEL DETAILS
2 Concrete C-219-D TURBINE BUILDING MEZZANINE FLOOR PLAN
2 Concrete C-220-B TURBINE BUILDING OPERATING FLOOR PLAN
2 Concrete C-221-B TURBINE BUILDING FLOOR DETAILS
2 Concrete C-222-A TURBINE BUILDING SWITCHGEAR SLAB REVISION
2 Concrete C-223-A INTAKE STRUCTURE PLANS
2 Concrete C-224-B INTAKE STRUCTURE PLAN AT ELEVATION 445.00' AND NORTH & SOUTH ELEVATIONS
2 Concrete C-225-A INTAKE STRUCTURE SECTION A-A & SECTION B-B
2 Concrete C-226-D INTAKE STRUCTURE EAST & WEST ELEVATIONS
2 Concrete C-227-A INTAKE STRUCTURE MISC. STEEL DETAILS
2 Concrete C-228-C SWITCHYARD FOUNDATION PLAN
2 Concrete C-229-B SWITCHYARD FOUNDATION DETAILS
2 Concrete C-230-B SWITCHYARD TRANSFORMER & MISC. FDNS.
2 Concrete C-231-A BOILER FOUNDATION PLAN & DETAILS
2 Concrete C-232-A BOILER STRUCTURE FAN DECK SLAB
2 Concrete C-233-C MISCELLANEOUS FDNS.
2 Concrete C-234-B MAINTENANCE BUILDING PILE PLAN
2 Concrete C-235-A MAINTENANCE BUILDING FOUNDATION PLAN & DETAILS
2 Concrete C-236-B MAINTENANCE BUILDING FOUNDATION REINFORCING PLAN AND DETAILS
2 Concrete C-237-B MAINTENANCE BUILDING STORAGE ROOM & SUBSTA. FDN. PLAN AND DETAILS
2 Concrete C-238-A INTAKE STRUCTURE ELECTRICAL DUCT DETAILS
2 Electrical E-233-C TURBINE AREA-BASEMENT FLOOR ELECTRICAL PLAN
2 Electrical E-234-D TURBINE AREA-MEZZANINE FLOOR ELECTRICAL PLAN
2 Electrical E-238-K MECHANICAL EQUIPMENT ROOM & BOILER GRADE ELECTRICAL PLAN
2 Electrical E-243-A YARD DUCT RUNS & MAIN GROUNDING SYSTEM PLAN
2 Electrical E-247-A FUEL OIL STORAGE PLAN & DETAILS
2 Electrical E-248-E INTAKE STRUCTURE PLAN, ELEVATIONS & DETAILS
2 Electrical E-249-B WATER TREATING AREA ADDITIONS
2 Electrical E-272-D MAINTENANCE BUILDING POWER PLAN, GROUNDING & DETAILS
2 General G-201-D SITE LAYOUT PLAN
2 General G-202-C PARKING & BOILER AREA PLAN & DETAILS
2 General G-203-B PARKING & BOILER AREA DETAILS
2 General G-204-B INTAKE STRUCTURE SHEET PILING LAYOUT & DETAILS
2 General G-205-A SOIL BORINGS PLAN & PROFILES
2 General G-206-A MISCELLANEOUS FOUNDATIONS BOILER AREA-UNIT NO. 1
2 General G-207-B 60"ø CIRCULATING COOLING WATER INTAKE PLAN AND DETAILS
2 General G-208-D 60"ø CIRCULATING COOLING WATER LINE EXTENSION PLAN AND DETAIL
2 General G-209-J SITE SPRINKLER SYSTEM PLAN & DETAILS
2 General G-210-F PROCESS & SANITARY SEWERS, BOILER & PARKING AREAS PLAN
2 General G-211-A PROVESS SEWER BOILER & PARKING AREA DETAILS
2 General G-212-A STORM SEWER MAINTENANCE BLDG. PLAN & DETAILS
2 Miscellaneous M-200-D INDEX OF DRAWINGS
2 Miscellaneous M-215-A EQUIPMENT LAYOUT ELEVATION 429'-0" PLAN
2 Miscellaneous M-216-B EQUIPMENT LAYOUT ELEVATION 445'-0" PLAN
2 Miscellaneous M-217-A EQUIPMENT LAYOUT ELEVATION 459'-0" PLAN
2 Miscellaneous M-218-A EQUIPMENT LAYOUT ELEVATION 475'-6" PLAN
2 Miscellaneous M-219-A EQUIPMENT LAYOUT ELEVATION 525'-9" PLAN
2 Piping P-201-J TURBO-GENERATOR BLDG. BASEMENT PLAN AT ELEVATION 429'-0"
2 Piping P-202-E TURBO GENERATOR BLDG. MEZZANINE FLOOR PLAN ELEVATION 445'-0"
2 Piping P-203-A TURBO GENERATOR BLDG OPERATING FLOOR PLAN ELEVATION 459'-0"
2 Piping P-204-E BOILER AREA PLAN BETWEEN ELEV. 445'-0" & 475'-6"
2 Piping P-205-F BOILER AREA PLAN BETWEEN ELEV. 475'-0" & 525'-9"
2 Piping P-206-C BOILER AREA PLAN BETWEEN ELEV. 525'-9" & 556'-6"
2 Piping P-207-D BOILER AREA PLAN BETWEEN ELEV. 556'-6" & 578'-6"
2 Piping P-208-K DEMINERALIZER AREA PLAN @ EL: 445'-0"
2 Piping P-208-M DEMINERALIZER AREA PLAN @ EL: 445'-0"
2 Piping P-210-G INTAKE STRUCTURE PLAN ELEVATION 445'-0"
2 Piping P-212-B TURBO-GENERATOR BLDG TURBINE PIPING PLANS & SECTION 'A'-'A'
2 Piping P-213-B TURBO-GENERATOR BLDG. TURBINE PIPING SECTIONS "B-B"; "C-C"; & "D-D"
2 Piping P-214-D TURBO-GENERATOR BLDG. SECTION "A-A" LOOKING WEST
2 Piping P-215-A TURBO-GENERATOR BLDG. SECTION "B-B" LOOKING WEST
2 Piping P-216-D TURBO-GENERATOR BLDG. SECTION "C-C" LOOKING WEST
2 Piping P-217-D TURBO-GENERATOR BLDG. SECTION "D-D" LOOKING EAST
2 Piping P-218-G TURBO-GENERATOR BLDG. SECTION "E-E" LOOKING WEST
2 Piping P-220-E TURBO-GENERATOR BLDG. SECTION 'G'-'G' LOOKING NORTH
2 Piping P-221-E TURBO-GENERATOR BLDG. SECTION 'H'-'H' LOOKING NORTH
2 Piping P-222-F TURBO GENERATOR BLDG. SECTION "J"-"J" LOOKING NORTH
2 Piping P-223-F TURBO GENERATOR BLDG. SECTION "K-K" LOOKING NORTH
2 Piping P-224-B MAINTENANCE PLDG. PLAN @ ELEV. 445'-0"
2 Piping P-225-E BOILER AREA SECTION "AA"-"AA" LOOKING WEST
2 Piping P-226-D BOILER AREA SECTION 'BB'-'BB' LOOKING EAST
2 Piping P-227-B BOILER AREA SECTION 'CC'-'CC' LOOKIG EAST
2 Piping P-228-D BOILER AREA SECTION "DD"-"DD" LOOKING SOUTH
2 Piping P-229-D BOILER AREA SECTION "EE"-"EE" LOOKING NORTH
2 Piping P-231-H DEMINERALIZER AREA SECTIONS 'M'-'M', 'N'-'N', 'P'-'P' & 'Q-Q'
2 Piping P-233-C INTAKE STRUCTURE SECTION 'Q'-'Q' 'R'-'R'
2 Piping P-236-B BOILER AREA SECTION 'UU'-'UU' LOOKING WEST & MISC DETAILS
2 Structural S-201-E TURBINE BUILDING ROOF FRAMING PLAN AND ELEVATIONS
2 Structural S-202-A STRUCTURAL TURBINE BUILDING SECTION, ELEVATIONS AND DETAILS
2 Structural S-203-A TURBINE BUILDING CRANE RUNWAY FRAMING PLAN AND DETAILS
2 Structural S-204-B TURBINE BUILDING SECTIONS AND DETAILS
2 Structural S-205-A TURBINE BUILDING AIR INTAKE STRUCTURE
2 Structural S-206-B TURBINE BUILDING OPERATING FLOOR FRAMING PLAN
2 Structural S-207-C TURBINE BUILDING MEZZANINE FLOOR FRAMING PLAN
2 Structural S-208-C TURBINE BUILDING BASEMENT FLOOR FRAMING PLAN
2 Structural S-209-C TURBINE BUILDING FLOOR FRAMING DETAILS
2 Structural S-210-B TURBINE BUILDING FLOOR FRAMING DETAILS
2 Structural S-211-A TURBINE BUILDING STAIRS SECTIONS & DETAILS
2 Structural S-212-C BOILER STRUCTURE FRAMING PLANS
2 Structural S-213-C BOILER STRUCTURE FRAMING PLANS
2 Structural S-214-E BOILER STRUCTURE FRAMING PLANS
2 Structural S-215-B BOILER STRUCTURE FRAMING PLANS
2 Structural S-216-B BOILER STRUCTURE ELEVATIONS
2 Structural S-217-B BOILER STRUCTURE STAIRS SECTIONS & DETAILS
2 Structural S-218-A BOILER STRUCTURE DETAILS
2 Structural S-219-B BOILER STRUCTURE ANCHOR BOLT PLAN AND DETAILS
2 Structural S-220-B BOILER STRUCTURE DEAERATOR SUPPORT FRAMING AND PLATFORM
2 Structural S-221-A BOILER STRUCTURE ACCESS WALKWAYS BOILER NO.1 TO BOILER NO.2
2 Structural S-222-A TURBINE BUILDING CRANE ACCESS LADDER AND PLATFORM
2 Structural S-223-A TURBINE BUILDING CONTROL ROOM STAIR
2 Structural S-224-C BOILER STRUCTURE F.D. PLATFORM PANEL SUPPORTS
2 Structural S-225 BOILER STRUCTURE F.D. FAN PLATFORM PANEL SUPPORTS
2 Structural S-225-A BOILER STRUCTURE SILENCER SUPPORTS AND DRUM ACCESS PLATFORMS
2 Structural S-226-C BOILER STRUCTURE MISCELLANEOUS STEEL
2 Structural S-227-A BOILER STRUCTURE STACK
2 Structural S-228-A CHEMICAL STORAGE SHELTERS CFT-21 AND CFT-22 PLATFORM
2 Structural S-229-A MISCELLANEOUS FRAMING
2 Structural S-234-A BOILER VESTIBLE ENCLOSURE
2 Structural S-235-A BOILER VESTIBLE ENCLOSURE DETAILS
2 Structural S-236-A BOILER VESTIBLE ENCLOSURE SUPPORT FRAMES
2 Structural S-237-B UNIT 2 FORCED DRAFT FAN ENCLOSURE FLOOR PLAN
2 Structural S-238-A UNIT 2 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL PLAN
2 Structural S-239-B UNIT 2 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL PLAN
2 Structural S-240-A UNIT 2 FORCED DRAFT FAN ENCLOSURE SECTION
2 Structural S-241-B UNIT 2 FORCED DRAFT FAN ENCLOSURE SECTION
2 Structural S-242-A UNIT 2 FORCED DRAFT FAN ENCLOSURE SECTION
2 Structural S-243-A UNIT 2 FORCED DRAFT FAN ENCLOSURE WALL SECTIONS
2 Structural S-244-B UNIT 2 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL DETAILS
2 Structural S-245-B UNIT 2 FORCED DRAFT FAN ENCLOSURE STRUCTURAL STEEL DETAILS
2 Structural S-246-B UNIT 2 FORCED DRAFT FAN ENCLOSURE TYPICAL DETAILS
2 Ventilation V-201-A INTAKE STRUCTURE PLAN AND SECTIONS
2 Ventilation V-202-A TURBINE BUILDING BASEMENT PLAN & SECTIONS
2 Ventilation V-203-B TURBINE BUILDING MAIN SUPPLY FAN & FILTERS PART PLANS AND SECTIONS
2 Ventilation V-204-B EQUIPMENT SCHEDULE AND MISC. DETAILS
2 Ventilation V-205-E DETAIL - SOUND ATTENUATORS - MAIN SUPPLY FAN
3 Architectural A-301-G TURBINE BUILDING FLOOR PLAN - GROUND FLOOR ELEV. 445'-0"
3 Architectural A-306-C TURBINE BUILDING ELEVATION
3 Architectural A-308-D CONTROL WING LOBBY & STAIRWAY PLAN & DETAILS
3 Architectural A-309-B TURBINE BUILDING LOBBY-STAIRWAY SECT. & DETS.
3 Architectural A-310-B CONTROL WING LOBBY & STAIRWAY SECTIONS & DETAILS
3 Architectural A-311-C CONTROL WING SECTIONS & DETAILS
3 Architectural A-312-B CONTROL ROOM CEILING DETAILS VENTILATOR DETAILS
3 Architectural A-313-F ROOM FINISH & DOOR SCHEDULES & DETAILS, WALL SECTIONS
3 Architectural A-314-B TURBINE ROOM WALL SECTIONS & DETAILS
3 Architectural A-315-B TURBINE ROOM WALL & PILING FLASHING DET'S.
3 Architectural A-316-C WALL-EMBLEM & SECTIONS FOR CONTROL WING - TURBO-GENERATOR BLDG.
3 Concrete C-301-B TURBINE BUILDING AND BOILER PILE PLAN
3 Concrete C-302-C TURBINE BUILDING MAT PLAN EL. 421.00'
3 Concrete C-303-H TURBINE BUILDING BASEMENT FLOOR PLAN EL. 429.00'
3 Concrete C-304-F TURBING BUILDING MEZZANINE FLOOR PLAN EL. 445.00'
3 Concrete C-305-F TURBINE BUILDING OPERATING FLOO PLAN EL. 459.00'
3 Concrete C-306-C TURBINE BUILDING PARTIAL PLAN AND DETAILS SOUTH WALL ELEVATION 445.00'
3 Concrete C-307-C TURBINE BUILDING PARTIAL PLAN AND DETAILS SOUTH WALL ELEVATION 459.00'
3 Concrete C-308-E TURBINE BUILDING SOUTH WALL ELEVATION
3 Concrete C-309-B TURBINE BUILDING NORTH WALL ELEVATION
3 Concrete C-310-A TURBINE BUILDING NORTH AND SOUTH WALL SECTIONS AND DETAILS
3 Concrete C-311-A TURBINE BUILDING WEST ELEVATION SECTIONS AND DETAILS
3 Concrete C-312-B TURBINE BUILDING BASEMENT FLOOR SECTION AND DETAILS SHEET 1 OF 2
3 Concrete C-313-B TURBINE BUILDING BASEMENT FLOOR SECTION AND DETAILS SHEET 2 OF 2
3 Concrete C-314-F TURBINE BUILDING MEZZANINE & OPERATING FLOOR DETAILS
3 Concrete C-315-C TURBINE BUILDING MEZZANINE FLOOR DETAILS & PLAN AT EL. 475.50'
3 Concrete C-316-D TURBINE BUILDING MISC. DETAILS AND SECTIONS
3 Concrete C-317-B TURBO-GENERATOR FOUNDATION PLAN OPERATING FLOOR LEVEL
3 Concrete C-318-A TURBO-GENERATOR FOUNDATION REINFORCING PLAT OPERATING FLOOR LEVEL
3 Concrete C-319-A TURBO-GENERATOR FOUNDATION ELEVATIONS
3 Concrete C-320-B TURBO-GENERATOR FOUNDATION SECTIONS
3 Concrete C-321-A TURBO-GENERATOR FOUNDATION SECTIONS
3 Concrete C-322-B TURBO-GENERATOR FOUNDATION SECTIONS AND DETAILS
3 Concrete C-323-B TURBO-GENERATOR FOUNDATION SECTIONS AND DETAILS
3 Concrete C-325-B CONTROL ROOM WING MAT PLAN-SECTIONS AND DETAILS
3 Concrete C-326-A CONTROL ROOM WING ENTRANCE PLAN & DETAILS
3 Concrete C-327-D CONTROL ROOM WING FLOOR PLAN SECTION AND DETAILS
3 Concrete C-328-B BOILER AREA KEY PLAN AND FOOTING DETAILS
3 Concrete C-329-A BOILER AREA FOOTING DETAILS
3 Concrete C-330-A BOILER AREA FOOTING DETAILS & PEDESTAL DETAILS
3 Concrete C-331-C BOILER & PARKING AREA GRADE SLAB PLAN & DETAILS
3 Concrete C-332-B BOILER & PARKING AREA DETAILS-SHEET 1 OF 3
3 Concrete C-333-A BOILER & PARKING AREA DETAILS-SHEET 2 OF 3
3 Concrete C-334-B BOILER & PARKING AREA DETAILS-SHEET 3 OF 3
3 Concrete C-335-B BOILER STRUCTURE FAN DECK SLAB EL. 562.00' F.O. STRAINER SLAB EL. 475.50'
3 Concrete C-336-C INTAKE STRUCTURE PLAN & DETAILS
3 Concrete C-337-B INTAKE STRUCTURE PLANS
3 Concrete C-338-B INTAKE STRUCTURE NORTH & SOUTH ELEVATIONS
3 Concrete C-339-B INTAKE STRUCTURE EAST & WEST ELEVATIONS
3 Concrete C-340-B INTAKE STRUCTURE SECTIONS & DETAILS (SHEET 1 OF 2)
3 Concrete C-341-B INTAKE STRUCTURE SECTIONS & DETAILS (SHEET 2 OF 2)
3 Concrete C-342-B INTAKE STRUCTURE MISC. STEEL DETAILS (SHEET 1 OF 2)
3 Concrete C-343-B INTAKE STRUCTURE MISC. STEEL DETAILS (SHEET 2 OF 2)
3 Concrete C-344-E SWITCHYARD FOUNDATION PLAN
3 Concrete C-345-C SWITCHYARD FOUNDATION DETAILS SHEET 1 OF 2
3 Concrete C-346-D SWITCHYARD FOUNDATION DETAILS SHEET 2 OF 2
3 Concrete C-347-B WATER TREATING AREA AND MISC. DETAILS
3 Concrete C-348-B MANHOLE NO. 17 & NO. 13 PLAN AND DEVELOPMENT
3 Concrete C-349-A TURBO-GENERATOR FOUNDATION PIPE HANGER ANCHOR BOLTS LOCATIONS & DETAILS
3 Electrical E-340-C GENERAL PLOT PLAN & GROUNDING SYSTEM
3 Electrical E-341-C MANHOLE DETAILS
3 Electrical E-342-E SWITCHYARD PLAN UNDERGROUND CONDUIT LAYOUT SECTIONS & DETAILS
3 Electrical E-343-D SWITCHYARD SECTIONS & DETAILS
3 Electrical E-345-H CONTROL ROOM WINGS PWER & GROUNDING
3 Electrical E-346-A TURBINE AREA BASEMENT PLAN POWER & GROUNDING
3 Electrical E-346-G TURBINE AREA BASEMENT PLAN POWER & GROUNDING
3 Electrical E-347-A TURBINE AREA MEZZANINE PLAN POWER & GROUNDING
3 Electrical E-347-F TURBINE AREA MEZZANINE PLAN POWER & GROUNDING
3 Electrical E-358-F BOILER LOWER ELEVATIONS POWER & INSTRUMENTS
3 Electrical E-373-G TANK FARM & FUEL OIL STORAGE
3 Electrical E-374-C INTAKE STRUCTURE POWER & LIGHTING
3 General G-301-D SITE LAYOUT PLAN
3 General G-302-E PROCESS & SANITARY SEWERS, BOILER & PARKING AREAS PLAN & DETAILS
3 General G-303-B SOIL BORINGS PLAN & PROFILES
3 General G-304-C INTAKE STRUCTURE SHEET PILING LAYOUT
3 General G-305-B RAILROAD ADDITION PLANT AREA
3 Mechanical A-318-E FLOOR & HUB DRAINS TURBINE BUILDING BASEMENT FLOOR PLAN EL. 429'-0"
3 Mechanical A-319-B FLOOR & HUB DRAINS TURBINE BUILDING PLANS EL. 421'-0", 429'-0", 475'-6"
3 Mechanical A-321-A NOISE MITIGATION - FORCED DRAFT FANS PARTIAL ENCLOSURE FLOOR PLAN
3 Mechanical A-322-A NOISE MITIGATION - FORCED DRAFT FANS PARTIAL ENCLOSURE EXTERIOR ELEVATIONS
3 Mechanical A-323-A NOISE MITIGATION - FORCED DRAFT FANS PARTIAL ENCLOSURE INTERIOR ELEVATIONS
3 Mechanical A-324-A NOISE MITIGATION - FORCED DRAFT FANS PARTIAL ENCLOSURE WALL SECTIONS
3 Mechanical A-325-A NOISE MITIGATION - FORCED DRAFT FANS PARTIAL ENCLOSURE DETAILS
3 Miscellaneous M-3000-A DRAWING SYMBOLS AND LEGEND
3 Miscellaneous M-314-A KEY PIPING PLAN
3 Miscellaneous M-315-B EQUIPMENT LAYOUT ELEVATION 421'-0" & 429'-0" PLAN
3 Miscellaneous M-316-B EQUIPMENT LAYOUT ELEVATION 445'-0" PLAN
3 Miscellaneous M-317-A EQUIPMENT LAYOUT ELEVATION 459'-0" PLAN
3 Miscellaneous M-318-A EQUIPMENT LAYOUT ELEVATION 475'-6" PLAN
3 Piping P-301-Q TURBO GENERATOR BLD'G. BASEMENT PLAN AT ELEVATION 429'-0"
3 Piping P-302-K TURBO GENERATOR BLD'G. MEZZANINE FLOOR PLAN ELEVATION 445'-0"
3 Piping P-303-D TURBO GENERATOR BLD'G. OPERATING FLOOR PLAN ELEVATION 459'-0"
3 Piping P-304-L TURBO-GENERATOR BLDG. BASEMENT-MEZZANINE & OPERATING FLOORS
3 Piping P-305-H TURBO-GENERATOR BLD'G. TURBINE PIPING PLAN
3 Piping P-306-H TURBO-GENERATOR BLD'G. TURBINE PIPING SECTIONS
3 Piping P-307-G TURBO-GENERATOR BLD'G. TURBINE PIPING SECTIONS
3 Piping P-308-F BOILER AREA PLAN @ ELEV. 445'-0" TO ELEV. 475'-6"
3 Piping P-309-F BOILER AREA PLAN @ ELEV. 475'-6" TO ELEV. 491'-6"
3 Piping P-310-F BOILER AREA PLAN ELEV. 491'-6" TO 515'-4"
3 Piping P-311-K BOILER AREA PLAN ELEV. 515'-4" TO 557'-4"
3 Piping P-312-F BOILER AREA PLAN @ELEV. 557'-4" TO ELEV. 579'-0"
3 Piping P-313-F BOILER AREA PLAN ELEV. 579'-0" UP
3 Piping P-314-J DEMINERALIZER AREA PLAN AT EL. 445'-0"
3 Piping P-315-C INTAKE STRUCTURE PLAN ELEVATION 445'-0"
3 Piping P-316-L TURBO GENERATOR BLD'G. SECTIONS -"A-A"-"M-M"-"N-N" "P-P"-"R-R"-"S-S" & "T-T"
3 Piping P-317-K TURBO-GENERATOR BLD'G. SECTIONS -"B=B" & "C-C" LOOKING WEST
3 Piping P-318-H TURBO GENERATOR BLD'G. SECTIONS -"D-D","J-J", "K-K", "L-L" DETAILS-"B"-"C"-"D"-"E" & "F"
3 Piping P-319-L TURBO-GENERATOR BLD'G. SECTIONS "E-E" & "F-F" LOOKING NORTH
3 Piping P-320-H TURBO-GENERATOR BLD'G. SECTIONS "G-G" & "H-H" LOOKING NORTH
3 Piping P-321-H TURBO-GENERATOR BLDG. SECTION "UU"-"VV"-"WW"
3 Piping P-322-H BOILER AREA SECTION "AA-AA" LOOKING WEST
3 Piping P-323-G BOILER AREA SECTION "BB-BB" LOOKING WEST
3 Piping P-324-H BOILER AREA SECTION "CC-CC" LOOKING EAST
3 Piping P-325-G BOILER AREA SECTION "DD"-"DD" LOOKING SOUTH
3 Piping P-326-G BOILER AREA SECTION "EE"-"EE" LOOKING SOUTH
3 Piping P-327-H BOILER AREA SECTION "FF"-"FF" LOOKING NORTH
3 Piping P-328-G BOILER AREA SECTION "GG"-"GG" LOOKING NORTH
3 Piping P-329-D CONTROL ROOM WING PLAN AT ELEVATIONS 445'-0" 459'-0" & 475'-6"
3 Piping P-330-H DEMINERALIZER AREA SECTIONS "A-A"; "B-B"
3 Piping P-331-C INTAKE STRUCTURE SECTIONS
3 Piping P-332-G YARD PIPING BETWEEN EMERGENCY GAS STORAGE AREA & WATER TREATING AREA PLAN AT EL. 445'-0"
3 Piping P-333-D CATION & ANION UNITS PLAN & SECTIONS PLAN ELEV. 445-6 SEC. "A-A", "B-B", "C-C" & "D-D"
3 Piping P-334-A TURBO GENERATOR BLDG. PIPING DETAILS FOR ITEMS BFP-32, CVP 31, AND CVP 32
3 Piping P-335-2 SUPPLY & RETURN FUEL OIL PIPING
3 Piping P-336-A HYDROGEN-SIDE AND AIR-SIDE SEAL OIL COOLING WATER PIPING ISOMETRICS
3 Piping P-337-A SCANNER AIR SUCTION ISOMETRIC
3 Piping P-338-A MISCELLANEOUS DETAILS
3 Plumbing A-320-E TURBINE BUILDING PLANS & DETAILS - CONTROL RM. EL. 445'-0", 459'-0", 475'-0"
3 Structural S-301-F TURBINE BUILDING ROOD FRAMING PLAN AND ELEVATION
3 Structural S-302-D TURBINE BUILDING ELEVATIONS AND DETAILS
3 Structural S-303-C TURBINE BUILDING CRANE RUNWAY FRAMING PLAN AND DETAILS
3 Structural S-304-D TURBING BUILDING SECTIONS, ELEVATIONS AND DETAILS
3 Structural S-305-D TURBINE BUILDING SECTIONS AND DETAILS
3 Structural S-306-C TURBINE BUILDING CRANE ACCES LADDER AND PLATFORM
3 Structural S-307-D TURBINE BUILDING DETAILS & SECTIONS
3 Structural S-308-D TURBINE BUILDING AIR INTAKE STRUCTURE
3 Structural S-309-E TURBINE BUILDING & CONTROL WING OPERATING FLOOR FRAMING PLAN
3 Structural S-310-H TURBINE BUILDING MEZZANINE FLOOR FRAMING PLAN
3 Structural S-311-E TURBINE BUILDING BASEMENT FLOOR FRAMING PLAN
3 Structural S-312-D TURBINE BUILDING OPERATING FLOOR FRAMING DETAILS
3 Structural S-313-E TURBINE BUILDING MEZZANINE FLOOR FRAMING DETAILS
3 Structural S-314-C TURBINE BUILDING BASEMENT FLOOR FRAMING DETAILS
3 Structural S-316-C TURBINE BUILDING & CONTROL ROOM WING STAIR DETAILS
3 Structural S-316-F TURBINE BUILDING CONTROL ROOM WING STEEL FRAMING PLANS, ELEVATIONS & DETAILS
3 Structural S-317-E TURBINE BUILDING CONTROL ROOM WING ELEVATIONS & DETAILS
3 Structural S-318-C TURBINE BUILDING CONTROL ROOM WING STEEL FRAMING, SECTIONS & DETAILS
3 Structural S-319-D TURBINE BUILDING SHEET PILE BULKHEAD SUPPORT
3 Structural S-320-C TURBINE BUILDING & CONTROL ROOM WING FLOOR FRAMING PLANS $ DETAILS
3 Structural S-321-A CHEMICAL STORAGE SHELTER PLANS, ELEVATIONS & DETAILS
3 Structural S-322-H BOILER STRUCTURE FRAMING PLAN ELEVATION 579'-0"
3 Structural S-323-H BOILER STRUCTURE FRAMING PLAN ELEVATION 559'-2 3/4"
3 Structural S-324-F BOILER STRUCTURE FRAMING PLAN ELEVATOIN 546'-2 3/4"
3 Structural S-325-K BOILER STRUCTURE FRAMING PLAN AT ELEVATION 531'-10 3/4"
3 Structural S-326-E BOILER STRUCTURE FRAMING PLAN ELEVATION 526'-5 3/4"
3 Structural S-327-H BOILER STRUCTURE FRAMING PLAN ELEVATION 515'-2 3/4"
3 Structural S-328-H BOILER STRUCTURE FRAMING PLAN ELEVATION 499'-4 3/4"
3 Structural S-329-E BOILER STRUCTURE FRAMING PLAN ELEVATION 491'-4 3/4"
3 Structural S-330-F BOILER STRUCTURE FRAMING PLAN ELEVATION 483'-4 3/4"
3 Structural S-331-U BOILER STRUCTURE FRAMING PLAN ELEVATION 475'-4 3/4"
3 Structural S-332-E BOILER STRUCTURE FRAMING PLAN ELEVATION 458'-10 3/4"
3 Structural S-333-D BOILER STRUCTURE ELEVATIONS
3 Structural S-335-C BOILER STRUCTURE DETAILS
3 Structural S-336-C BOILER STRUCTURE ELEVATIONS & DETAILS
3 Structural S-338-D BOILER STRUCTURE ANCHOR BOLT PLAN & MISCELLANEOUS DETAILS
3 Structural S-339-E BOILER STRUCTURE FRAMING PLAN EL 591'-0" & DETAILS
3 Structural S-340-E BOILER STRUCTURE ELEVATION & DETAILS
3 Structural S-341-C BOILER STRUCTURE PLATFORMS BETWEEN NO.2 AND NO.3 BOILER
3 Structural S-342-C BOILER STRUCTURE ELEVATOR FRAMING - ELEVATIONS & DETAILS
3 Structural S-343-C BOILER STRUCTURE ELEVATOR FRAMING - DETAILS
3 Structural S-344-C BOILER STRUCTURE SILENCER SUPPORTS
3 Structural S-345-B BOTTLE RACK FRAMING DETAILS
3 Structural S-346-B STEEL FRAMING FOR SOUND REDUCTION PANELS
3 Structural S-347-B BOILER STRUCTURE PLATFORMS BETWEEN NO.2 AND NO.3 BOILERS SHEET 1
3 Structural S-348-A BOILER STRUCTURE PLATFORMS BETWEEN NO.2 AND NO.3 BOILERS SHEET 2
3 Structural S-349-A BOILER STRUCTURE ADDITIONS & MODIFICATIONS
3 Structural S-358-A NOISE MITIGATION-FORCED DRAFT FANS PARTIAL ENCLOSURE DEMOLITION PLAN
3 Structural S-359-A NOISE MITIGATION-FORCED DRAFT FANS PARTIAL ENCLOSURE EXISTING PIPING PLAN
3 Structural S-360-A NOISE MITIGATION-FORCED DRAFT FANS PARTIAL ENCLOSURE EXISTING PIPING PLAN
3 Ventilation V-301-D ALL BUILDINGS EQUIPMENT SCHEDULE & MISC. DETAILS
3 Ventilation V-302-B TURBINE BUILDING GENERAL OFFICE PLAN & SECTIONS ELEV. 445'-0"
3 Ventilation V-303-C TURBINE BUILDING ROOF EXHAUST FANS PLAN & SECTIONS
3 Ventilation V-304-F TURBINE BUILDING CONTROL ROOM PLAN AND SECTIONS
3 Ventilation V-305-D TURBINE BUILDING STAIRWELL AND SWITCHGEAR ROOM PLAN AND SECTIONS
3 Ventilation V-306-C TURBINE BUILDING BASEMENT DUCTWORK PLAN ELEV. 429'-0"
3 Ventilation V-307-B TURBINE BUILDING MAIN SUPPLY FAN & FILTERS PLANS & SECTIONS
3 Ventilation V-308-B INTAKE STRUCTURE PLAN AND SECTIONS
3 Ventilation V-309-B INTAKE STRUCTURE PLAN AND SECTIONS
4 Architectural A-4001-C TURBINE-GENERATOR BUILDING FLOOR PLAN- MEZZANINE ELEV. 445'-0"
4 Architectural A-4002-D TURBINE GENERATOR BUILDING FLOOR PLAN- OPERATING FLR. ELEV. 459'-0"
4 Architectural A-4003-B TURBINE GENERATOR BUILDING FLOOR PLAN ELEV. 475'-6"
4 Architectural A-4004-E TURBINE GENERATOR BUILDING ROOF PLAN
4 Architectural A-4005-B TURBINE GENERATOR BUILDING ELEVATIONS
4 Architectural A-4006-B TURBINE GENERATOR BUILDING ELEVATION
4 Architectural A-4007-A TURBINE GENERATOR BUILDING BUILDING SECTIONS
4 Architectural A-4008-C TURBINE GENERATOR BUILDING CONTROL ROOM DETAILS
4 Architectural A-4009-A TURBINE GENERATOR BUILDING WALL SECTIONS & DETAILS
4 Architectural A-4011-F ELEVATOR ELEVATIONS, PLANS, & DETAILS
4 Architectural A-4012-B TURBINE - GENERATOR BUILDING WALL EMBLEM DETAILS
4 Architectural A-4013-D TURBINE - GENERATOR BUILDING SCHEDULES
4 Architectural A-4014-A TURBINE - GENERATOR BUILDING WALL SECTIONS & DETAILS
4 Architectural A-4014-D CHEMICAL FEED & F.W. ANALYZER BLDG. PLANS, ELEVATIONS, SECTIONS & DETAILS
4 Architectural A-4015-D PLAN & GATEHOUSE DETAILS
4 Architectural A-4016-B GATEHOUSE DETAILS
4 Architectural A-4017-B BOILER STRUCTURE F.D. FAN SOUND REDUCTION PANELS
4 Architectural A-4018-B EMBLEM PLANT ENTRANCE & OFFICE
4 Architectural A-4037-C EXISTING LOGIC ROOM
4 Architectural A-4041-C DCS BATTERY BUILDING ELEVATIONS
4 Architectural A-4501-C FUEL OIL FACILITIES : R.O. BLDG. FLOOR PLAN, ELEV, SECTION, DETAILS
4 Concrete C-4001-B TURBINE GENERATOR & BOILER AREA PILE PLAN
4 Concrete C-4002-C TURBINE GENERATOR BUILDING MAT PLAN AT ELEV. 421.00'
4 Concrete C-4003-C TURBINE GENERATOR BUILDING BASEMENT FLOOR PLAN AT ELEV. 429.00'
4 Concrete C-4004-C TURBINE GENERATOR BUILDING MEZZANINE FLOOR PLAN ELEV. 445.00'
4 Concrete C-4005-C TURBINE GENERATOR BUILDING OPERATING FLOOR PLAN EL. 459.00'
4 Concrete C-4006-C TURBINE GENERATOR BLDG. SOUTH WAL ELEVATION
4 Concrete C-4007-C TURBINE GENERATOR BLDG. WEST WALL ELEV'S & DETAILS
4 Concrete C-4008-B TURBINE GENERATOR BLDG. NORTH WALL ELEVATION AND DETAILS.
4 Concrete C-4009-C TURBINE GENERATOR BLDG. WALL SECTIONS & DETAILS
4 Concrete C-4010-C TURBINE GENERATOR BLDG. SECTIONS & DETAILS
4 Concrete C-4011-C TURBINE GENERATOR BUILDING MAT SECTIONS AND DETAILS
4 Concrete C-4012-B TURBINE GENERATOR BUILDING BASEMENT FLOOR SECTIONS & DETAILS
4 Concrete C-4013-C TURBINE GENERATOR BUILDING BASEMENT FLOOR AND MAT SECTIONS AND DETAILS
4 Concrete C-4014-B TURBINE GENERATOR BUILDING MEZZANINE FLOOR SECTIONS & DETAILS
4 Concrete C-4015-B TURBINE GENERATOR BLDG. OPERATING FLOOR SECTIONS AND DETAILS
4 Concrete C-4016-C TURBINE GENERATOR BLDG. SECTIONS AND DETAILS.
4 Concrete C-4017-B BOILER FEED PUMP FOUNDATION PLAN, SECTIONS & DETAILS
4 Concrete C-4018-B BOILER FEED PUMP FOUNDATION ELEVATIONS & SECTIONS
4 Concrete C-4019-B TURBINE GENERATOR FOUNDATION OPERATING FLOOR PLAN ELEV. 459.00'
4 Concrete C-4020-B TURBINE GENERATOR FOUNDATION REINFORCING PLAN OPERATING FLOOR EL. 459.00'
4 Concrete C-4021-B TURBINE GENERATOR FOUNDATION MEZZANINE PLAN AND SECTIONS
4 Concrete C-4022-B TURBINE GENERATOR FOUNDSTION ELEVATIONS AND SECTIONS
4 Concrete C-4023-B TURBINE GENERATOR FOUNDATION SECTIONS
4 Concrete C-4024-B TURBINE GENERATOR FOUNDATION SECTIONS AND DETAILS
4 Concrete C-4025-B TURBINE GENERATOR FOUNDATION SECTIONS AND DETAILS
4 Concrete C-4026-B BOILER AREA FOOTING LOCATION KEY PLAN FOOTING DETAILS
4 Concrete C-4027-C BOILER AREA FOOTING DETAILS
4 Concrete C-4028-C BOILER AREA ROOF SLAB PLAN & DETAILS
4 Concrete C-4029-D BOILER AREA FAN DECK SLAB EL. 546.31'
4 Concrete C-4030-B SWITCHYARD AREA PLAN & DETAILS
4 Concrete C-4031-B SWITCHYARD AREA SECTION & DETAILS
4 Concrete C-4032-C TURBINE GENERATOR BUILDING SECTIONS AND DETAILS
4 Concrete C-4033-B INTAKE STRUCTURE MAT PLAN & DETAILS
4 Concrete C-4034-C INTAKE STRUCTURE PLAN AT ELEV. 423.35
4 Concrete C-4035-D INTAKE STRUCTURE PLAN & SECTIONS
4 Concrete C-4036-B INTAKE STRUCTURE ELEVATIONS & SECTIONS
4 Concrete C-4037-B INTAKE STRUCTURE SECTIONS & DETAILS
4 Concrete C-4038-C INTAKE STRUCTURE SECTIONS & DETAILS
4 Concrete C-4039-B INTAKE STRUCTURE MISCELLANEOUS STEEL DETAILS
4 Concrete C-4040-B INTAKE STRUCTURE WING WALLS PLAN & SECTIONS
4 Concrete C-4041-B DISCHARGE STRUCTURE AND LIFT STA. PLAN AND DETAILS
4 Concrete C-4042-D BOILER & PARKING AREA GRADE SLAB PLAN
4 Concrete C-4043-C BOILER & PARKING AREA SECTIONS AND DETAILS
4 Concrete C-4044-E BOILER & PARKING AREA SECTIONS & DETAILS
4 Concrete C-4045-E YARD MISC. FOUNDATIONS
4 Concrete C-4046-G FUEL OIL UNLOADING AREA FOUNDATION PLANS AND DETAILS
4 Concrete C-4047-C CHEMICAL FEED & F.W. ANALYZER BUILDING FOUNDATION PLAN, SECTIONS & DETAILS
4 Concrete C-4048-B CHEMICAL FEED & F.W. ANALYZER BUILDING FLOOR SLAB PLAN, SECTIONS & DETIALS
4 Concrete C-4049-B CONTROL ROOM WING REWORK OF EXISTING FLOORS
4 Concrete C-4050-C WATER TREATMENT AREA NEUTRALIZATION SUMP PLAN, SECTION & DETAIL
4 Concrete C-4500-C FUEL OIL FACILITIES FOUNDATION LOCATION PLAN
4 Concrete C-4501-B FUEL OIL FACILITIES PUMP HOUSE PLANS
4 Concrete C-4502-B FUEL OIL FACILITIES PUMP HOUSE SECTION & DETAILS
4 Concrete C-4503-B FUEL OIL FACILITIES PUMP HOUSE SECTION & DETAILS
4 Concrete C-4504-B FUEL OIL FACILITIES MISCELLANEOUS FOUNDATIONS
4 Concrete C-4505-C FUEL OIL FACILITIES MISCELLANEOUS FOUNDATIONS
4 Concrete C-4506-B FUEL OIL FACILITIES MISCELLANEOUS FOUNDATIONS
4 Electrical E-4053-G TURBINE AREA MEZZANINE EL. 445'-0"
4 Electrical E-4061-C INTAKE STRUCTURE PLAN & DETAILS
4 Electrical E-4069-D AUX. BLDGS. & F.O. TRANSFER PLANS & DETAILS
4 Electrical E-4070-F MISCELLANEOUS PLANS & DETAILS
4 Electrical E-4505-D UNDERGROUND DUCT SYSTEM-GROUNDING AREA LIGHTING
4 Electrical E-4506-D DUCT SYSTEM LIGHTING DETAILS
4 General G-4001-B SITE LAYOUT PLAN
4 General G-4002-F CIRCULATING WATER INTAKE AND DISCHARGE PLAN
4 General G-4003-N GRADING, DRAINAGE, ROAD & PAVING PLAN
4 General G-4004-B SOIL BORINGS PLAN & PROFILES
4 General G-4005-C SITE DRAINAGE & ROADWAYS SECTIONS & DETAILS
4 General G-4006-B TURBINE-GENERATOR BUILDING HUB & FLOOR DRAINS
4 General G-4007-C BOILER & PARKING AREAS UNDERGROUND PIPING
4 General G-4501-B FUEL OIL FACILITIES ROADS, DRAINAGE & GRADING
4 General G-4502-B FIRE PROTECTION SYSTEM PLAN
4 General G-4503-C FUEL OIL FACILITIES SEWER SYSTEMS PLAN
4 General G-4504-D FUEL OIL UNLOADING AREA PAVING & SEWERS PLAN
4 Miscellaneous M-4015-D KEY PIPING PLAN
4 Miscellaneous M-4016-B EQUIPMENT LAYOUT ELEVATION 421'-0" & 429'-0" PLAN
4 Miscellaneous M-4017-B EQUIPMENT LAYOUT ELEVATION 445'-0" PLAN
4 Miscellaneous M-4018-B EQUIPMENT LAYOUT ELEVATION 459'-0" PLAN
4 Miscellaneous M-4019-B EQUIPMENT LAYOUT ELEVATION 475'-6" PLAN
4 Miscellaneous M-4020-B EQUIPMENT LAYOUT ELEVATION 504'-0" & ABOVE PLAN
4 Miscellaneous M-4021-B EQUIPMENT LAYOUT SECTIONS "A-A" & "B-B"
4 Miscellaneous P-4501-B KEY PIPING PLAN
4 Piping P-4001-C TURBINE GENERATOR BLDG. BASEMENT FLOOR PLAN ELEVATION 429'-0"
4 Piping P-4002-C TURBINE GENERATOR BLDG. MEZZANINE FLOOR PLAN ELEVATION 445'-0"
4 Piping P-4003-B TURBINE GENERATOR BLDG. OPERATING FLOOR PLAN ELEVATION 459'-0"
4 Piping P-4004-C TURBINE GENERATOR BLDG. PLANS @ DEAERATOR ELEV. 475'-6" TO 487'-6" & ELEV. 487'-6"
4 Piping P-4005-C TURBINE GENERATOR BLDG. PLAN @ ELEVATION 421'-0" & SECTION "K-K" LOOKING SOUTH
4 Piping P-4006-D BOILER AREA PLAN ELEV. 445'-0" TO 459'-0"
4 Piping P-4007-C BOILER AREA PLAN ELEV. 459'-0" TO 486'-2"
4 Piping P-4009-E BOILER AREA PLAN ELEV. 486'-2" TO 545'-9"
4 Piping P-4010-C BOILER AREA PLAN ELEV. 5454'-9" & ABOVE
4 Piping P-4011-F CHEMICAL FEED & F.W. ANALYZER BLDG. & CONDENSATE STORAGE TANK PLAN @ ELEV. 445'-0"
4 Piping P-4012-C TURBINE GENERATOR BLDG. SECTION "A-A" LOOKING WEST
4 Piping P-4013-D TURBINE GENERATOR BLDG SECTION "B-B" LOOKING WEST
4 Piping P-4014-C TURBINE GENERATOR BLDG SECTION "C-C" LOOKING EAST
4 Piping P-4015-B TURBINE GENERATOR BLDG SECTION "D-D" LOOKING EAST
4 Piping P-4016-C TURBINE GENERATOR BLDG SECTION "E-E" LOOKING EAST
4 Piping P-4017-B TURBINE GENERATOR BLDG SECTION "F-F" LOOKING SOUTH
4 Piping P-4018-C TURBINE GENERATOR BLDG SECTION "G-G" & SECTION "H-H" LOOKING NORTH
4 Piping P-4019-C TURBINE GENERATOR BLDG SECTION "J-J" LOOKING NORTH
4 Piping P-4020-D MISCELLANEOUS CONTROL STATION DETAILS
4 Piping P-4021-C MISCELLANEOUS CONTROL STATION DETAILS
4 Piping P-4022-B MISCELLANEOUS CONTROL STATION DETAILS
4 Piping P-4023-B MISCELLANEOUS CONTROL STATION DETAILS
4 Piping P-4024-D CONDENSER VACUUM PUMPS (CVP-41 & 42) LUBE OIL AND DISCHARGE PIPING
4 Piping P-4025-C DETAILS OF ECONOMIZER RECIRCULATION AND BFPT START-UP STEAM
4 Piping P-4030-B BOILER AREA SECTION "AA-AA" ELEV. 445'-0" TO 580'-6" LOOKING WEST
4 Piping P-4031-C BOILER AREA SECTION "BB-BB" ELEV. 445'-0" TO 580'-6" LOOKING EAST
4 Piping P-4032-D BOILER AREA SECTION "CC-CC" ELEV. 445'-0" TO 520'-6" LOOKING NORTH
4 Piping P-4034-C BOILER AREA SECTION "DD-DD" ELEV. 445'-0" TO 520'-6" LOOKING SOUTH
4 Piping P-4035-B BOILER AREA SECTION "DD-DD" EL. 520'-6" & ABOVE LOOKING SOUTH
4 Piping P-4036-B BOILER AREA MISCELLANEOUS SECTIONS & DETAILS
4 Piping P-4037-B PLANS, SECTIONS & DETAILS OF BOILER LEVEL GAUGE SIGHT DUCT & 48" BOILER FEED PUMP TURBINE EXHAUST LINE
4 Piping P-4038-C MISCELLANEOUS DETAILS
4 Piping P-4039-C BOILER AREA MISCELLANEOUS DETAILS
4 Piping P-4040-D INTAKE STRUCTURE PLAN ELEVATION 445'-0"
4 Piping P-4041-C INTAKE STRUCTURE SECTIONS & DETAILS
4 Piping P-4042-H FUEL OIL UNLOADING AREA PLAN & SECTIONS ELEVATION 445'-0"
4 Piping P-4043-F FUEL OIL STORAGE AREA PLAN ELEVATION 445'-0"
4 Piping P-4044-D FUEL OIL & CONDENSATE STORAGE AREAS & MISC. SECTIONS & DETAILS
4 Piping P-4045-B BOILER AREA ASPIRATING AIR SYSTEM
4 Piping P-4074 NO. 5 F.O. PIPE PLAN
4 Piping P-4075 NO. 5 F.O. PIPE DETAILS
4 Piping P-4076 NO. 2 F.O. PIPE PLAN - SHEET 1
4 Piping P-4077 NO. 2 F.O. PIPE PLAN - SHEET 2
4 Piping P-4078 NO. 2 F.O. PIPE DETAILS
4 Piping P-4080 SUPPLY & RETURN FUEL OIL PIPING
4 Piping P-4502-E FUEL OIL UNLOADING AREA AND AUX. BOILER HOUSE PLAN
4 Piping P-4503-D PIPE RACK BETWEEN AUX. BOILER PUMP HOUSE AND STORAGE TANKS PLAN
4 Piping P-4504-E FUEL OIL STORAGE TANKS FST-42, FST-43, FST-44 AND FST-45 PLAN
4 Piping P-4505-D FUEL OIL AREA MISCELLANEOUS SECTIONS AND DETAILS
4 Piping P-4506-D REVERSE OSMOSIS (R.O.)BUILDING PLAN AT EL. 438'-8" AND 423'-8" MISC. SECTIONS & DETAILS
4 Piping P-4507-C FUEL OIL UNLOADING PUMPS AND ROAD CROSSING SECTIONS AND DETAILS
4 Structural A-4038-C NEW LOGIC ROOM PLAN
4 Structural A-4039-C NEW LOGIC ROOM DETAIL
4 Structural A-4040-D DCS BATTERY BUILDING
4 Structural S-4001-D TURBINE GENERATOR BUILDING ROOF FRAMING PLAN
4 Structural S-4002-C TURBINE GENERATOR BUILDING MISC. PLANS, SECTIONS, DETAILS
4 Structural S-4003-E TURBINE GENERATOR BLDG. OPERATING FLOOR PLAN
4 Structural S-4004-E TURBINE GENERATOR BLDG. MEZZANINE FLOOR PLAN
4 Structural S-4005-D TURBINE GENERATOR BLDG. BASEMENT FLOOR PLAN
4 Structural S-4006-D TURBINE GENERATOR BUILDING ELEVATIONS
4 Structural S-4007-D TURBINE GENERATOR BUILDING SECTIONS
4 Structural S-4008-C TURBINE GENERATOR BUILDING CRANE BEAM DETAILS
4 Structural S-4009-D TURBINE GENERATOR BUILDING SECTIONS AND DETAILS SHEET 1
4 Structural S-4010-C TURBINE GENERATOR BUILDING SECTIONS AND DETAILS SHEET 2
4 Structural S-4011-E TURBINE GENERATOR BUILDING AIR INTAKE STRUCTURE
4 Structural S-4012-C TURBINE GENERATOR BLDG. OPERATING FLOOR DETAILS
4 Structural S-4013-C TURBINE GENERATOR BUILDING MEZZANINE FLOOR FRAMING DETAILS
4 Structural S-4014-C TURBINE GENERATOR BLDG. BASEMENT FLOOR DETAILS
4 Structural S-4015-D TURBINE GENERATOR BLDG. STAIR ELEVATIONS & DETAILS
4 Structural S-4016-E TURBINE GENERATOR BUILDING MISC. PLATFORMS & DETAILS
4 Structural S-4017-C TURBINE GENERATOR BUILDING FRAMING DETAILS
4 Structural S-4018-C TURBINE GENERATOR BLDG. WINDOW DETAILS
4 Structural S-4019-C BOILER STRUCTURE PLAN AT BASE PLATES
4 Structural S-4020-E BOILER STRUCTURE PLAN AT ELEVATION 459'-0"
4 Structural S-4021-F BOILER STRUCTURE PLAN AT ELEVATION 475'-6"
4 Structural S-4022-C BOILER STRUCTURE PLAN AT ELEVATION 486'-2"
4 Structural S-4023-D BOILER STRUCTURE PLAN AT ELEVATION 497'-0"
4 Structural S-4024-D BOILER STRUCTURE PLAN AT ELEVATION 508'-4"
4 Structural S-4025-E BOILER STRUCTURE PLAN AT ELEVATION 520'-6"
4 Structural S-4027-D BOILER STRUCTURE PLAN AT ELEVATION 545'-9"
4 Structural S-4028-E BOILER STRUCTURE PLAN AT ELEVATION 557'-9"
4 Structural S-4029-E BOILER STRUCTURE PLAN AT ELEVATION 580'-6" & PLAN AT ELEVATION 592'-0"
4 Structural S-4030-D BOILER STRUCTURE SOUTH ELEVATION AT COL. LINE "8.3" EAST ELEVATION AT COL. LINE "W.3"
4 Structural S-4031-F BOILER STRUCTURE NORTH ELEVATION AT COL. LINE "5.1" WEST ELEVATION AT COL. LINE "AA.8"
4 Structural S-4032-D BOILER STRUCTURE SOUTH ELEVATION AT COL. LINE "6.6" EAST ELEVATION AT COL. LINE "Y.8"
4 Structural S-4033-D BOILER STRUCTURE EAST ELEVATION AT COL. LINE "Y" EAST ELEVATION AT COL. LINE "X.2"
4 Structural S-4034-C BOILER STRUCTURE PLATE GIRDER AND COLUMN SPLICE DETAILS
4 Structural S-4035-C BOILER STRUCTURE BRACING DETAILS
4 Structural S-4036-D BOILER STRUCTURE SOUTH ELEVATION STAIR NO.1 STAIR DETAILS
4 Structural S-4037-E BOILER STRUCTURE SOUTH ELEVATION STAIR NO.2 & No.3
4 Structural S-4038-C BOILER STRUCTURE PLATFORMS BETWEEN UNITS #3 AND #4
4 Structural S-4039-C BOILER STRUCTURE CORNERS @ ELEVATIONS 475'-6" AND 486'-2"
4 Structural S-4040-E BOILER STRUCTURE MISC. PLATFORMS & SUPPORTS
4 Structural S-4041-D BOILER STRUCTURE ELEVATOR FRAMING (SHEET 1)
4 Structural S-4042-E BOILER STRUCTURE ELEVATOR FRAMING (SHEET 2)
4 Structural S-4043-E BOILER STRUCTURE BOTTLE RACK
4 Structural S-4044-C INTAKE STRUCTURE MISCELLANEOUS STEEL DETAILS
4 Structural S-4045-D TURBINE GENERATOR BLDG. GIRT & HANDRAIL DETAILS
4 Structural S-4046-C TURBINE GENERATOR BUILDING PARTIAL ELEVATION AT LINE "W"
4 Structural S-4047-B SWITCHYARD AREA P.T. AND BUS SUPPORT STRUCTURES
4 Structural S-4049-C SUPPORTS FOR SOUND REDUCTION PANELS AT FAN DECK
4 Structural S-4061-D RETERMINATION DECK PLATFORM ADDITION
4 Structural S-4062-D RETERMINATION DECK PLATFORM ADDITION
4 Structural S-4065-B UNIT 4 FORCED DRAFT FAN ENCLOSURE FRAMING PLAN
4 Structural S-4066-B UNIT 4 FORCED DRAFT FAN ENCLOSURE SECTIONS
4 Structural S-4067-B UNIT 4 FORCED DRAFT FAN ENCLOSURE WALL SECTIONS
4 Structural S-4068-B UNIT 4 FORCED DRAFT FAN ENCLOSURE TYPICAL DETAILS
4 Structural S-4069-B UNIT 4 FORCED DRAFT FAN ENCLOSURE FLOOR PLAN
4 Structural S-4070-B UNIT 4 BOILER WEST WALL ENCLOSURE PLANS
4 Structural S-4071-B UNIT 4 BOILER WEST WALL ENCLOSURE PLANS
4 Structural S-4072-B UNIT 4 BOILER WEST WALL ENCLOSURE ELEVATIONS
4 Structural S-4075-B UNIT 4 FORCED DRAFT FAN ENCLOSURE DETAILS
4 Structural S-4501-B FUEL OIL FACILITIES PUMP HOUSE CRANE LEVEL & STAIR
4 Structural S-4502-B FUEL OIL FACILITIES PUMP HOUSE ROOF PLAN & MISC. DETAILS
4 Ventilation V-4001-B HVAC PLOT PLAN
4 Ventilation V-4002-B HAVC EQUIPMENT SCHEDULES
4 Ventilation V-4003-B HVAC TURBINE GENERATOR BLDG. BASEMENT PLAN AND SECTIONS
4 Ventilation V-4004-B HVAC TURBINE GENERATOR BLDG. FAN PLANS, SECTIONS, AND DETAILS
4 Ventilation V-4005-B HVAC TURBINE GENERATOR BLDG. ROOF PLAN AND DETAIL
4 Ventilation V-4006-B HVAC ELEVATOR & T.G. BLDG. TOILET PLANS, ELEVATIONS AND DETAILS
4 Ventilation V-4007-B CHEMICAL FEED & F.W. ANALYZER BLDG. PLAN, ELEVATIONS, SECTIONS AND DETAILS
4 Ventilation V-4008-B HVAC INTAKE STRUCTURE VENTILATION PLAN AND SECTIONS
4 Ventilation V-4009-B HVAC BOILER HOUSEING - ELEV. 580'-6" PLAN, ELEVATIONS, AND DETAIL
4 Ventilation V-4010-B HVAC GATE HOUSE PLAN, SECTIONS, AND DETAILS
4 Ventilation V-4012-A CONTROL ROOM A/C UPGRADE MECHANICAL DEMOLITION PLAN
4 Ventilation V-4013-A CONTROL ROOM A/C UPGRADE MECHANICAL DEMOLITION PLAN
4 Ventilation V-4014-B CONTROL ROOM A/C UPGRADE MECHANICAL PLAN
4 Ventilation V-4015-A CONTROL ROOM A/C UPGRAGE MECHANICAL ROOF PLAN
4 Ventilation V-4016-A CONTROL ROOM A/C UPGRADE MECHANICAL DETAILS
4 Ventilation V-4017-A CONTROL ROOM A/C UPGRADE MECHANICAL DETAILS AND SCHEDULES
4 Ventilation V-4501-D FUEL OIL FACILITIES PLANS, SECTION AND DETAILS
NA Electrical EG-4D11-C GROUNDING SYSTEM FOR DIESEL GENERATOR BUILDING
NA Electrical EW-4083-C CANOPY LIGHTING & EQUIPMENT GROUNDING PLAN & DETAILS
NA General C-211755 CATHODIC PROTECTION ADDITION LOCATION PLAN & DETAILS
NA General G-306-D OIL SKIMMER PIT
NA General G-4008-A SITE PLAN (DRAINAGE UPGRADE PROJECT)
NA General G-4009-A OIL/WATER SEPARATOR PLAN AND ELEVATIONS (DRAINAGE UPGRADE PROJECT)
NA General G-4010-A OIL/WATER SEPARATOR DETAILS (DRAINAGE UPGRADE PROJECT)
NA General G-4011-A OIL/WATER SEPARATOR DETAILS (DRAINAGE UPGRADE PROJECT)
NA General G-4012-A DETAILS (DRAINAGE UPGRADE PROJECT)
NA General G-4013-A ELECTRICAL PLOT PLAN AND DIAGRAMS (DRAINAGE UPGRADE PROJECT)
NA General G-4014-A ELECTRICAL DETAILS AND SECTIONS (DRAINAGE UPGRADE PROJECT)
NA General G-4016-D OIL/WATER SEPARATOR IMPROVEMENTS SITE PLAN
NA General G-4505 1 of 2 CATHODIC PROTECTION (SHEET 1 OF 2)
NA General G-4505 2 of 2 CATHODIC PROTECTION (SHEET 2 OF 2)
NA General ME-1 SITE PLAN & RESTROOM PLAN
NA Miscellaneous Cover - Control Room AC Upgrade Cover - Control Room AC Upgrade
NA Miscellaneous Cover - Noise Mitigation Cover - Noise Mitigation
NA Miscellaneous H-FN0-01 GENERAL NOTES AND SYMBOLS
NA Miscellaneous H-FS1-01a FIRE ALARM AND FIRE PROTECTION SITE PLAN NORTH
NA Miscellaneous H-FS1-01b FIRE ALARM AND FIRE PROTECTION SITE PLAN SOUTH
NA Miscellaneous SD-H-017 AREA PLAN, YARD LAYOUT
NA Miscellaneous SD-H-018-C FIRE PROTECTION SYSTEM AND SERVICE WATER VALVE LOCATIONS
NA Miscellaneous SD-H-018-D FIRE PROTECTION SYSTEM AND SERVICE WATER VALVE LOCATIONS
NA Miscellaneous SD-H-024 STORAGE & WELDING SHOP BUILDING
NA Miscellaneous SD-H-025 SITE PLAN INDEX AND SITE DETAILS
NA Miscellaneous SD-H-026 FLOOR PLAN SCHEDULE & ELEVATIONS
NA Miscellaneous SD-H-027 ELEVATIONS, WALL SECTIONS & DETAILS
NA Miscellaneous SD-H-028 REFLECTED CLG. PLAN AND DETAILS
NA Miscellaneous SD-H-029 ELECTRICAL PLAN DETAILS & SCHEDULES
NA Miscellaneous SD-H-030 HVAC & PLUMBING PLAN DETAILS & SCHEDULES
NA Miscellaneous SD-H-031 FOUNDATION PLAN ROOF FRAMING PLAN DETAILS AND SCHEDULE
NA Miscellaneous SD-H-032 STRUCTURAL DETAILS
NA Miscellaneous SD-H-033 FOUNDATION PLAN (REVISED)
NA Miscellaneous SD-H-046 DEMINERALIZER LINES
NA Miscellaneous SD-H-047 1 of 2 HOLLY STREET POWER PLANT
NA Miscellaneous SD-H-048 2 of 2 LONGHORN DAM & PENINSULA
NA Miscellaneous SD-H-051 HOLLY STREET POWER STATION ACID/CAUSTIC CONTAINMENT STRUCTURE
NA Miscellaneous SD-H-059 1 of 3 HOLLY POWER PLANT DEMINERALIZER BUILDING ADDITION
NA Miscellaneous SD-H-059 2 of 3 HOLLY POWER PLT. DEMIN. BLDG. ADDIT.
NA Miscellaneous SD-H-059 3 of 3 HOLLY POWER PLANT DEMINERALIZER BUILDING ADDITION
NA Miscellaneous SD-H-062 HAZARDOUS MATERIAL LOCATION MAP
NA Miscellaneous SD-H-073-F WASTEWATER DISCHARGE OUTLETS
NA Miscellaneous SD-H-122 UNDERGROUND UTILITIES
NA Piping M-1 HVAC & PLUMBING PLAN, DETAILS & SCHEDULES
NA Structural S-122-A UNITS 1,2,3 & 4 EMISSIONS MONITORING PLATFORMS KEY PLAN AND ELEVATIONS
NA Structural S-123-A UNITS 1,2,3 & 4 EMISSIONS MONITORING PLATFORMS PLAN, SECTIONS, AND DETAILS
NA Structural S-124-A ANALYZER SHELTER LOCATION PARTIAL PLAN AND FOUNDATION DETAILS
NA Structural S-125-A DECKER STREET STATION EMISSION MONITORING PLATFORMS STANDARD SECTIONS AND DETAILS
NA Structural S-230-A UNITS 1,2,3, & 4 EMISSIONS MONITORING PLATFORMS KEY PLAN AND ELEVATIONS
NA Structural S-231-A UNITS 1,2,3, & 4 EMISSIONS MONITORING PLATFORMS PLANS, SECTIONS, AND DETAILS
NA Structural S-232-A ANALYZER SHELTER LOCATION PARTIAL PLAN AND FOUNDATION DETAILS
NA Structural S-233-A DECKER STREET STATION EMISSION MONITORING PLATFORMS STANDARD SECTIONS AND DETAILS
NA Structural S-354-A UNITS 1, 2, 3 & 4 EMISSIONS MONITORING PLATFORMS KEY PLAN AND ELEVATIONS
NA Structural S-355-A UNITS 1, 2, 3 & 4 EMISSIONS MONITORING PLATFORMS PLANS, SECTIONS AND DETAILS
NA Structural S-356-A ANALYZER SHELTER LOCATION PARTIAL PLAN AND FOUNDATION DETAILS
NA Structural S-357-A DECKER CREEK STATION EMISSIONS MONITORING PLATFORMS STANDARD SECTIONS AND DETAILS
NA Structural S-4050-A UNITS 1, 2, 3 & 4 EMISSIONS MONITORING PLATFORMS KEY PLAN AND ELEVATIONS
NA Structural S-4051-A UNITS 1, 2, 3 & 4 EMISSIONS MONITORING PLATFORMS PLANS, SECTIONS AND DETAILS
NA Structural S-4052-2-A ANALYZER SHELTER FOUNDATION EXTENSION
NA Structural S-4052-A ANALYZER SHELTER LOCATION PARTIAL PLAN AND FOUNDATION DETAILS
NA Structural S-4053-A DECKER CREEK STATION EMISSIONS MONITORING PLATFORMS STANDARD SECTIONS AND DETAILS
NA Structural S-4073-C UNITS 1,2,3 & 4 MISCELLANEOUS DETAILS
NA Structural S-4074-C UNITS 1,2,3 & 4 COLUMN ROW GENERAL ARRANGEMENT