Austin Energy Website
Holly Plant Decommissioning Project
Inicio
Comunicaciones
RUTA DE CAMIONES
HORAS
Galería de Fotos
Desmantelamiento
Pre-Desmantelamiento
Construcción
Boletines
Preguntas Frecuentes
Contactenos
Desmantelamiento
Pre-Desmantelamiento
Construcción
Construcción
(Presione el imagen para ver en español)
H4 – Oct 1974- Completed: Final Field Survey
H3 – Nov 1966 – Completion
Aerial: Pre-construction South View of Holly Site
Aerial: Pre-construction view of Holly Site
Holly 2 Foundation: Sub Floors
Holly 1 Groundbreaking: April 1959
H1 – Generator Arrives
H2-Jan 1963-Steam turbine casings arrive
H1 & H2 – Aerial East
H1 & H2-Aerial South
H1-Commemoration- Control Room
H1-Commemoration- Viewing the control board.
H1-Commemoration- Walking the steam turbine floor
H1-Feb 1961 – Aerial South
H1-Feb 1961 – Aerial South
H1- Jun 1960 – Aerial West
H1- Apr 1960 – Aerial West
H1-Nov 1959 – Guiding the generator
H1-Nov 1959 – Generator Lift
H1-Jan 1960 – Setting the high pressure turbine rotor on the turbine floor
H1- Jan 1960 – Preparing for the high pressure turbine rotor lift.
H1-Jan 1960 – The high pressure turbine rotor arrives from the factory.
H1- Jan 1960 – Cooling water intake structure
H1- Nov 1959 – Low Pressure turbine Casing awaits final placement.
H1 – Nov 1959 – Feedwater Heaters rolled into place.
H1- Jan 1960 – Holly Unit view from the north.
H1- Nov 1959 – Switchyard under construction.
H1- Nov 1959 – Switchyard columns go up.
H3 – Nov 1966 – The latest addition, Holly Unit 3 turbine generator.
H1 & H2 – Jan 1963 – Aerial North
H2 – Nov 1962 – Boiler East view
H2 – Jan 1963 – Boiler North view
H2 – Dec 1962 – Foundation rising.
H2 – Mar 1963 – Generator arrives
H3 – Jan 1965 – Foundation Aerial East
H3 – Jan 1965 – Foundation Aerial West
H3 – Nov 1964 – Preparing the basement foundation
H3 – Nov 1964 – Concrete Pour
H3 – Feb 1965 – Turbine generator pedestals
Holly – Feb 1963 – Maintenance shop
Jun 1960 – Longhorn Dam Aerial East
Jan 1961 – Longhorn Dam Aerial Overhead
Jun 1960 – Longhorn Dam Aerial South
Dec 1959 – Longhorn Dam looking west
H1-Jul 1960 – Council Members and Utility Director Commemorate the operation of Holly Unit 1
H1-Jul 1960-Council Member Edgar Perry at the controls.
H1-Nov 1959-Maneuvering the generator into place
H1-Nov 1959 – Generator Arrival rail car makes its approach
H1 & H2 – Aerial South
H3 – Jan 1965 – Foundation Aerial West
Esta entrada de blog está también disponible en: English
Inglés
Idiomas
English
(
Inglés
)
Español
Entradas de Blog Recientes
Maquinaría de Construcción de Alta Resistencia
Noticia de Holly 4: ¡Demolición de la caldera para 5/17/2013!
Noticia de Holly 4: ¡Demolición de la caldera!
Edificio de Generador de Turbina: Mitad Ido
El Edificio del Generador de Turbina: Bajando
Nuestras Entradas de Blog por Mes
Mayo 2013
Abril 2013
Marzo 2013
Febrero 2013
Enero 2013
Diciembre 2012
Noviembre 2012
Octubre 2012
Septiembre 2012
Agosto 2012
Julio 2012
Junio 2012
Mayo 2012
Abril 2012
Marzo 2012
Febrero 2012
Enero 2012
Diciembre 2011
Noviembre 2011
Octubre 2011
Septiembre 2011
Agosto 2011
Etiquetas Populares
caldera
chimenea
condenser
Contratista
Remoción de Acero
rotor del generador eléctrico
tanque de Agua
Turbina de vapor
turbinas de vapor