Austin Energy Website
Holly Plant Decommissioning Project
Home
Communications
Haul Route
Construction Hours
Image Gallery
Holly Plant: Decommissioning
Holly Plant: Pre-Decommissioning
Holly Plant: Construction
Newsletter
FAQ
Jobs
Contact Us
Holly Plant: Decommissioning
Holly Plant: Pre-Decommissioning
Holly Plant: Construction
Holly Plant: Decommissioning
(Presione el imagen para ver en español)
Scaffolding Construction on Holly Unit 3 – 6
Scaffolding Construction on Holly Unit 3 – 5
Scaffolding Construction on Holly Unit 3 – 4
Scaffolding Construction on Holly Unit 3 – 3
Scaffolding Construction on Holly Unit 3 – 2
Scaffolding Construction on Holly Unit 3 – 1
Steam Turbine – 6
Steam Turbine – 5
Steam Turbine – 4
Steam Turbine – 3
Steam Turbine – 2
Steam Turbine – 1
Steam Turbines – Main Crane
Holly Unit 2 – Abatement 6
Holly Unit 2 – Abatement 5
Holly Unit 2 – Abatement 3
Holly Unit 2 – Abatement 2
Holly Unit 2 – Abatement 1
Scaffolding Construction on Holly Unit 2 – 3
Scaffolding Construction on Holly Unit 2 – 2
Scaffolding Construction on Holly Unit 2 – 1
Scaffolding Construction on Holly Unit 3
Scaffolding Construction on Holly Unit 2 – 4
Intake Structure with Scuba Diver – 3
Intake Structure with Scuba Diver – 2
Intake Structure with Scuba Diver – 1
Intake Screens
Barricade Barrier Installed – 2
Barricade Barrier Installed – 1
Waste Water Treatment System 3
Waste Water Treatment System 2
Waste Water Treatment System 1
Oil Removal 3
Oil Removal 2
Oil Removal 1
Parking Lot Finished
Flaggers at Work
Barricades Installed – 6
Barricades Installed – 5
Barricades Installed – 4
Barricades Installed – 3
Barricades Installed – 2
Barricades Installed – 1
Parking Lot Finishing Touches – 4
Parking Lot Finishing Touches – 3
Parking Lot Finishing Touches – 2
Parking Lot Finishing Touches – 1
Asbestos Removal 26
Asbestos Removal 25
Asbestos Leaving Holly Plant – 9
Asbestos Leaving Holly Plant – 8
Asbestos Leaving Holly Plant – 7
Asbestos Leaving Holly Plant – 5
Asbestos Leaving Holly Plant – 4
Asbestos Leaving Holly Plant – 3
Asbestos Leaving Holly Plant – 2
Asbestos Leaving Holly Plant – 1
Asbestos Removal 24
Asbestos Removal 23
Asbestos Removal 22
Asbestos Removal 21
Asbestos Removal 20
Asbestos Removal 19
Asbestos Removal 18
Asbestos Removal 17
Asbestos Removal 16
Asbestos Removal 15
Asbestos Removal 14
Paving Metz Parking Lot – 13
Paving Metz Parking Lot – 12
Paving Metz Parking Lot – 11
Paving Metz Parking Lot – 10
Paving Metz Parking Lot – 9
Paving Metz Parking Lot – 8
Paving Metz Parking Lot – 7
Paving Metz Parking Lot – 6
Paving Metz Parking Lot – 5
Paving Metz Parking Lot – 4
Paving Metz Parking Lot – 3
Paving Metz Parking Lot – 2
Paving Metz Parking Lot – 1
Metz Parking Lot – Sidewalk in progress
Parking Lot Flexible Base 6
Parking Lot Flexible Base 5
Parking Lot Flexible Base 4
Parking Lot Flexible Base 3
Parking Lot Flexible Base 2
Parking Lot Flexible Base 1
Vacuum Truck-Oil Removal
Asbestos Removal 13 – Holly 1 Boiler Water Lines
Asbestos Removal 12
Asbestos Removal 11
Asbestos Removal 10
Asbestos Removal 9 – Boiler Wind Barrier
Asbestos Removal 8 – Boiler Wind Barrier
Asbestos Removal 7 – Asbestos Removal Roll Offs Waiting for Transport
Asbestos Removal 6 – Boiler Wind Barrier
Asbestos Removal 5 – Boiler Wind Barrier
Asbestos Removal 1
Asbestos Removal 3
Asbestos Removal 2 – Boiler Wind Barrier Goes Up
Residual Acid Removal
Road Paving – 5
Road Paving – 4
Road Paving – 3
Road Paving – 2
Road Paving – 1
Road Paving – 10
Road Paving – 9
Road Paving – 8
Road Paving – 7
Road Paving – 6
Oil Lubricants Storage Container
Oil Lubricants Temporary Storage
Building Siding Removal
Parking Lot Entrance – 3
Parking Lot Entrance – 2
Parking Lot Entrance – 1
Haskell Water Line Connection
Asbestos Removal Roll Offs – 2
Asbestos Removal Roll Offs – 1
Haul Road Entrance – 4
Haul Road Entrance – 3
Haul Road Entrance – 2
Haul Road Construction – 2
Haul Road Construction – 1
Cyclist passing by the Haul Road Plant Entrance
Abatement Containment Enclosures – 7
Abatement Containment Enclosures – H1 Control Room
Abatement Containment Enclosures – 5
Abatement Containment Enclosures – 4
Haul Road – 4
Haul Road – 6
Haul Road – 5
Haul Road – 3
Haul Road – 2
Haul Road – 1
Asbestos Abatement Containment Enclosures – 3
Asbestos Abatement Containment Enclosures
Asbestos Abatement Containment Enclosures
Future entrance to the temporary Metz parking lot
Preparing for haul road construction
Metz Baseball field – home of future parking lot.
Wrenches in place for Holly Plant Ceremony
Holly Neighborhood Committee Turning the Wrenches at Holly Plant
Residents waiting for Holly Plant Ceremony to Begin
Mayor of Austin, Lee Leffingwell, speaks at the Holly Plant Ceremony
Mayor of Austin, Lee Leffingwell, Austin Energy General Manager, Larry Weis, and Council Member, Mike Martinez, at Holly Plant Bolt Removal Ceremony
This post is also available in: En Español
Spanish
Tagged with:
Community Meetings
•
Images
Languages
English
Español
(
Spanish
)
Recent Posts
Up .. goes the Scaffolding!
It’s a wrap .. Turbines get their turn.
Abatement 2: The Work continues …
Scaffolding is where it’s at …
Underwater Adventures at Holly Plant
Our Monthly Posts
May 2012
April 2012
March 2012
February 2012
January 2012
December 2011
November 2011
October 2011
September 2011
August 2011
Popular Tags
asbestos
Communications
Community Meetings
Construction Hours
Contractor
Haul
holly
Images
jobs
Newletter
Noise