Holly Plant: Decommissioning
Holly Plant: Pre-Decommissioning
Holly Plant: Construction
Holly Plant: Construction
(Presione el imagen para ver en español)
H4 – Oct 1974- Completed: Final Field Survey
H1 – Generator Arrives
H1 – Nov 1959 – Feedwater Heaters rolled into place.
H1 & H2 – Aerial East
H2 – Jan 1963 – Boiler North view
Dec 1959 – Longhorn Dam looking west
Jun 1960 – Longhorn Dam Aerial East
H1-Jan 1960 – The high pressure turbine rotor arrives from the factory.
H1-Commemoration- Walking the steam turbine floor
H1 & H2-Aerial South
H2 – Mar 1963 – Generator arrives
H1-Nov 1959 – Guiding the generator
H1- Nov 1959 – Switchyard columns go up.
H1- Jun 1960 – Aerial West
Aerial: Pre-construction view of Holly Site
H1-Commemoration- Control Room
H3 – Jan 1965 – Foundation Aerial East
H1- Jan 1960 – Cooling water intake structure
Jun 1960 – Longhorn Dam Aerial South
Jan 1961 – Longhorn Dam Aerial Overhead
H3 – Nov 1966 – The latest addition, Holly Unit 3 turbine generator.
H1 & H2 – Jan 1963 – Aerial North
H1-Jul 1960-Council Member Edgar Perry at the controls.
Jun 1960 – Longhorn Dam Aerial West
H1-Nov 1959 – Generator Lift
Holly – Feb 1963 – Maintenance shop
H1- Nov 1959 – Low Pressure turbine Casing awaits final placement.
H1- Nov 1959 – Switchyard under construction.
H2 – Dec 1962 – Foundation rising.
Holly 1 Groundbreaking: April 1959
Jun 1960 – Longhorn Dam Aerial North
H1-Feb 1961 – Aerial South
H1-Feb 1961 – Aerial South
H1-Jul 1960 – Council Members and Utility Director Commemorate the operation of Holly Unit 1
H3 – Jan 1965 – Foundation Aerial West
H1-Commemoration- Viewing the control board.
H3 – Jan 1965 – Foundation Aerial West
H1-Jan 1960 – Setting the high pressure turbine rotor on the turbine floor
H1 & H2 – Aerial South
Holly 2 Foundation: Sub Floors
H1-Nov 1959 – Generator Arrival rail car makes its approach
H3 – Feb 1965 – Turbine generator pedestals
H2-Jan 1963-Steam turbine casings arrive
H1- Jan 1960 – Preparing for the high pressure turbine rotor lift.
H1-Nov 1959-Maneuvering the generator into place
H3 – Nov 1964 – Preparing the basement foundation
H1- Apr 1960 – Aerial West
H1- Jan 1960 – Holly Unit view from the north.
H2 – Nov 1962 – Boiler East view
H3 – Nov 1964 – Concrete Pour
Aerial: Pre-construction South View of Holly Site
H3 – Nov 1966 – Completion
This post is also available in: En Español
Spanish
Tagged with:
holly
•
Images
Languages
English
Español
(
Spanish
)
Recent Posts
Heavy Duty Demolition Equipment
Holly Unit 3: Boiler Demolition Update for 5/17/2013
Holly Unit 4: Boiler Demolition Update
Turbine Generator Building: Half Gone
Turbine Generator Building Coming Down
Our Monthly Posts
May 2013
April 2013
March 2013
February 2013
January 2013
December 2012
November 2012
October 2012
September 2012
August 2012
July 2012
June 2012
May 2012
April 2012
March 2012
February 2012
January 2012
December 2011
November 2011
October 2011
September 2011
August 2011
Popular Tags
asbestos
Boiler
Communications
Community Meetings
Construction Hours
Contractor
crane
exciter
FAQ
generator
Haul
holly
Holly 1
Holly 2
Holly 3
Holly 4
Images
jobs
Newletter
Noise
Stack
steel removal
turbine