Austin Energy Website
Holly Plant Decommissioning Project
Home
Communications
Haul Route
Construction Hours
Image Gallery
Holly Plant: Decommissioning
Holly Plant: Pre-Decommissioing
Holly Plant: Construction
Newsletter
FAQ
Jobs
Contact Us
Holly Plant: Decommissioning
Holly Plant: Pre-Decommissioing
Holly Plant: Construction
Holly Plant: Construction
(Presione el imagen para ver en español)
H1 & H2 – Aerial South
Holly 2 Foundation: Sub Floors
H1-Nov 1959 – Generator Arrival rail car makes its approach
H1- Nov 1959 – Low Pressure turbine Casing awaits final placement.
H1-Nov 1959 – Guiding the generator
H3 – Nov 1966 – The latest addition, Holly Unit 3 turbine generator.
H1- Jan 1960 – Cooling water intake structure
H4 – Oct 1974- Completed: Final Field Survey
H1- Nov 1959 – Switchyard under construction.
Holly 1 Groundbreaking: April 1959
H1-Nov 1959 – Generator Lift
H1-Jan 1960 – Setting the high pressure turbine rotor on the turbine floor
H2 – Dec 1962 – Foundation rising.
Jun 1960 – Longhorn Dam Aerial South
H1-Feb 1961 – Aerial South
H1-Nov 1959-Maneuvering the generator into place
H2 – Nov 1962 – Boiler East view
H1- Jun 1960 – Aerial West
H3 – Nov 1964 – Concrete Pour
H2 – Jan 1963 – Boiler North view
H3 – Nov 1964 – Preparing the basement foundation
H1-Jan 1960 – The high pressure turbine rotor arrives from the factory.
Jun 1960 – Longhorn Dam Aerial West
H1- Jan 1960 – Holly Unit view from the north.
Holly – Feb 1963 – Maintenance shop
Jun 1960 – Longhorn Dam Aerial East
H2-Jan 1963-Steam turbine casings arrive
Jun 1960 – Longhorn Dam Aerial North
Aerial: Pre-construction view of Holly Site
H1-Jul 1960 – Council Members and Utility Director Commemorate the operation of Holly Unit 1
H3 – Jan 1965 – Foundation Aerial West
H2 – Mar 1963 – Generator arrives
H1 & H2-Aerial South
H1 – Nov 1959 – Feedwater Heaters rolled into place.
H1- Jan 1960 – Preparing for the high pressure turbine rotor lift.
H1-Commemoration- Control Room
H3 – Feb 1965 – Turbine generator pedestals
H1-Commemoration- Walking the steam turbine floor
Aerial: Pre-construction South View of Holly Site
H1- Nov 1959 – Switchyard columns go up.
H1- Apr 1960 – Aerial West
Dec 1959 – Longhorn Dam looking west
H1 & H2 – Jan 1963 – Aerial North
H3 – Jan 1965 – Foundation Aerial West
H1 & H2 – Aerial East
H3 – Jan 1965 – Foundation Aerial East
Jan 1961 – Longhorn Dam Aerial Overhead
H1 – Generator Arrives
H1-Jul 1960-Council Member Edgar Perry at the controls.
H1-Feb 1961 – Aerial South
H3 – Nov 1966 – Completion
H1-Commemoration- Viewing the control board.
Tagged with:
holly
•
Images
Languages
English
Español
(
Spanish
)
Recent Posts
FYI: Flyers are out!
Down with the Pavement
NEWS: Asbestos Captured!
Here Comes the Haul Road ..
Abatement Procedures Take Center Stage
Our Monthly Posts
February 2012
January 2012
December 2011
November 2011
October 2011
September 2011
August 2011
Popular Tags
asbestos
Communications
Community Meetings
Construction Hours
Contractor
Haul
holly
Images
jobs
Newletter
Noise