| ID | |
| Quantity | 1 |
| Description | Combustion Engineering Steam Generator (Boiler) |
| Category | Boilers |
| Unit# | 2 |
| Floor | |
| Make | CE Boiler |
| Name Plate Data | Built 1959 / Continuous Capacity – 800,000 LB/HR / Maximum Pressure – 1,725 PSI / Superheater - 1005° F / Reheater Capacity – 698,600 LB/HR / Maximum Pressure – 575 PSI / Temperature 1005° F |
| Equipment Model# | |
| 1980 Inventory Sheet | No |

