Estimated Material Quantities

DISCLAIMER: The quantities presented in this table are estimates taken from as-built drawings, field measurements, and estimates made during the design  phase of the Holly Street Power Plant Decommissioning Project.  The CONTRACTOR is responsible for verifying or determining actual quantities of materials on-site using independent methods.  The information in this table represent a rough order of magnitude estimate of materials on-site.

Building Name Ferrous Steel*
[Long Tons4]
Concrete
[Cubic Yards]
Reinforcing Steel
[Long Tons4]
Wood
[Tons6]
Plastics
[Tons6]
Glass
[Tons6]
Holly Units 3 & 4 Analyzer House (Building J)1 4.5 25.0 1.0 0.0 0.0 0.0
Demineralization Building (Building L)1 8.0 23.0 1.9 0.0 0.0 0.0
Water Discharge Structure1 0.0 34.0 3.4 0.0 0.0 0.0
Demineralization Water Tanks including Tank Pedestals and Containment Structures1 150.0 98.0 2.9 0.0 0.0 0.0
Demineralized Water Yard Pipe Racks1 9.3 20.0 0.7 0.0 0.0 0.0
West Neutralization Pit & East Neutralization Pit1 0.9 90.0 4.5 0.0 0.0 0.0
Gas Metering Building (Building O)1 0.0 8.0 0.2 0.0 0.0 0.0
Gas Evaluation Building (Building P)1 0.0 13.0 0.4 0.0 0.0 0.0
HAZMAT Storage Building (Building M)1 0.5 17.0 0.7 1.7 0.0 0.0
Holly Insulation Shop (Building N)1 2.7 18.0 0.8 0.0 0.0 0.0
Gas Reducer Structure (Building R)1 6.2 16.0 0.4 0.0 0.0 0.0
Water Tank (former Fuel Oil Tank #41)1 137.0 21.0 0.4 0.0 0.0 0.0
Shipping and Receiving Building 25.9 141.0 6.0 0.0 0.0 0.0
Warehouse and Maintenance Shop (Building W)1,3 0.0 0.0 0.0 108.0 0.0 0.0
Oil Pipe Box Culvert1 0.0 40.0 4.0 0.0 0.0 0.0
Reverse Osmosis Building (RO)/Fuel Oil Pump House#21 3.2 728.0 25.3 0.0 0.0 0.0
GFRP & Plastic Storage Tanks1 0.0 0.0 0.0 0.0 3.5 0.0
Training, Oil Drum Storage, and Boat Storage (Building S)1 0.0 35.0 1.4 38.0 0.0 0.0
Former Fuel Oil Tank Rings 42 - 45 & Oil Pipe Cradles1 0.0 438.0 10.5 0.0 0.0 0.0
Battery Building5 1.0 13.0 0.8 Unknown Unknown Unknown
Transformers (N of Units 1 and 2)5 0.0 211.0 12.5 Unknown Unknown Unknown
Transformers (N of Units 3 and 4) 5 0.0 200.0 11.8 Unknown Unknown Unknown
Turbine Generator Building (Units 1-4) 5 2,078.0 11,000.0 660.0 Unknown Unknown Unknown
Boiler Structur Unit 15 209.0 200.0 12.0 Unknown Unknown Unknown
Boiler Structure Unit 25 398.0 200.0 12.0 Unknown Unknown Unknown
Boiler Structure Unit 35 343.0 200.0 12.0 Unknown Unknown Unknown
Boiler Structure Unit 45 247.0 200.0 12.0 Unknown Unknown Unknown
Valves and Piping in the Boilers and Generator Building2 852.0 0.0 0.0 0.0 0.0 0.0
Control Room for Boiler Units 3 & 4 (Building G)5 45.0 5,250.0 315.0 Unknown Unknown Unknown
Control Room for Boiler Units 1 & 2 (Building H)5 45.0 5,250.0 315.0 Unknown Unknown Unknown
Holly Oil Drum Storage Rack Unknown Unknown Unknown Unknown Unknown Unknown
Acid & Caustic Tanks Unknown Unknown Unknown Unknown Unknown Unknown
South Oil / Water Separator Unknown Unknown Unknown Unknown Unknown Unknown
Former Materials Storage Unknown Unknown Unknown Unknown Unknown Unknown
Former Oil Heater Unknown Unknown Unknown Unknown Unknown Unknown
Former Oil Heater Unknown Unknown Unknown Unknown Unknown Unknown
Former Oil Heater Unknown Unknown Unknown Unknown Unknown Unknown
SUBTOTAL 4,566.2 24,489.0 1,427.6 147.7 3.5 0.0
Estimated recoverable material from equipment if not sold2 13,640.0 0.0 0.0 0.0 0.0 0.0
TOTAL 18,206.2 24,489.0 1,427.6 147.7 3.5 0.0
Hazardous Materials Storage Building (former Guard House at Haskell Street)3 Unknown Unknown Unknown Unknown Unknown Unknown
Main Oil/Water Separator3 Unknown Unknown Unknown Unknown Unknown Unknown
Emissions Module (Building K)1 Unknown Unknown Unknown Unknown Unknown Unknown
Warehouse and Maintenance Shop (Building W)3 Unknown Unknown Unknown Unknown Unknown Unknown
Water Intake Structures Units 1, 2, 3, and 43 Unknown Unknown Unknown Unknown Unknown Unknown
Diesel Generator Building Unknown Unknown Unknown Unknown Unknown Unknown
Holly Switchyard3 Unknown Unknown Unknown Unknown Unknown Unknown
Weston Field Office3 Unknown Unknown Unknown Unknown Unknown Unknown
Austin Energy Laboratory Service (AELS) Bldg. B3 Unknown Unknown Unknown Unknown Unknown Unknown
AELS Annex Bldg. E3 Unknown Unknown Unknown Unknown Unknown Unknown
Guard House at Holly St. Entrance/Exit3 Unknown Unknown Unknown Unknown Unknown Unknown
Entry Gate and Exit Gate3 Unknown Unknown Unknown Unknown Unknown Unknown
Pedernales Substation3 Unknown Unknown Unknown Unknown Unknown Unknown
Administration Building (Building X)3 Unknown Unknown Unknown Unknown Unknown Unknown
Chillers, their Foundation, Pipe Racks3 Unknown Unknown Unknown Unknown Unknown Unknown


NOTES:
* - Structural steel, Sheet Metal, Sound Attenuation Panels, Chain Link Fence
1 - Information from Austin Energy Holly Street Power Plant: Decommissioning of Ancillary Structures Technical Memo prepared by Enotech Engineering Consultants, Inc., Dec. 2008
2 - Additional components of the Emergency Generator House Building removed prior to deconstruction activities.
3 - Structure to remain onsite.
4- One long ton = 2,240 lbs or 1.12 tons
5 - Information provided by Jose I. Guerra, Inc.
6 - 1 ton = 2,000 lbs