Estimated Material Quantities
DISCLAIMER: The quantities presented in this table are estimates taken from as-built drawings, field measurements, and estimates made during the design phase of the Holly Street Power Plant Decommissioning Project. The CONTRACTOR is responsible for verifying or determining actual quantities of materials on-site using independent methods. The information in this table represent a rough order of magnitude estimate of materials on-site.
| Building Name |
Ferrous Steel* [Long Tons4] |
Concrete [Cubic Yards] |
Reinforcing Steel [Long Tons4] |
Wood [Tons6] |
Plastics [Tons6] |
Glass [Tons6] |
|---|---|---|---|---|---|---|
| Holly Units 3 & 4 Analyzer House (Building J)1 | 4.5 | 25.0 | 1.0 | 0.0 | 0.0 | 0.0 |
| Demineralization Building (Building L)1 | 8.0 | 23.0 | 1.9 | 0.0 | 0.0 | 0.0 |
| Water Discharge Structure1 | 0.0 | 34.0 | 3.4 | 0.0 | 0.0 | 0.0 |
| Demineralization Water Tanks including Tank Pedestals and Containment Structures1 | 150.0 | 98.0 | 2.9 | 0.0 | 0.0 | 0.0 |
| Demineralized Water Yard Pipe Racks1 | 9.3 | 20.0 | 0.7 | 0.0 | 0.0 | 0.0 |
| West Neutralization Pit & East Neutralization Pit1 | 0.9 | 90.0 | 4.5 | 0.0 | 0.0 | 0.0 |
| Gas Metering Building (Building O)1 | 0.0 | 8.0 | 0.2 | 0.0 | 0.0 | 0.0 |
| Gas Evaluation Building (Building P)1 | 0.0 | 13.0 | 0.4 | 0.0 | 0.0 | 0.0 |
| HAZMAT Storage Building (Building M)1 | 0.5 | 17.0 | 0.7 | 1.7 | 0.0 | 0.0 |
| Holly Insulation Shop (Building N)1 | 2.7 | 18.0 | 0.8 | 0.0 | 0.0 | 0.0 |
| Gas Reducer Structure (Building R)1 | 6.2 | 16.0 | 0.4 | 0.0 | 0.0 | 0.0 |
| Water Tank (former Fuel Oil Tank #41)1 | 137.0 | 21.0 | 0.4 | 0.0 | 0.0 | 0.0 |
| Shipping and Receiving Building | 25.9 | 141.0 | 6.0 | 0.0 | 0.0 | 0.0 |
| Warehouse and Maintenance Shop (Building W)1,3 | 0.0 | 0.0 | 0.0 | 108.0 | 0.0 | 0.0 |
| Oil Pipe Box Culvert1 | 0.0 | 40.0 | 4.0 | 0.0 | 0.0 | 0.0 |
| Reverse Osmosis Building (RO)/Fuel Oil Pump House#21 | 3.2 | 728.0 | 25.3 | 0.0 | 0.0 | 0.0 |
| GFRP & Plastic Storage Tanks1 | 0.0 | 0.0 | 0.0 | 0.0 | 3.5 | 0.0 |
| Training, Oil Drum Storage, and Boat Storage (Building S)1 | 0.0 | 35.0 | 1.4 | 38.0 | 0.0 | 0.0 |
| Former Fuel Oil Tank Rings 42 - 45 & Oil Pipe Cradles1 | 0.0 | 438.0 | 10.5 | 0.0 | 0.0 | 0.0 |
| Battery Building5 | 1.0 | 13.0 | 0.8 | Unknown | Unknown | Unknown |
| Transformers (N of Units 1 and 2)5 | 0.0 | 211.0 | 12.5 | Unknown | Unknown | Unknown |
| Transformers (N of Units 3 and 4) 5 | 0.0 | 200.0 | 11.8 | Unknown | Unknown | Unknown |
| Turbine Generator Building (Units 1-4) 5 | 2,078.0 | 11,000.0 | 660.0 | Unknown | Unknown | Unknown |
| Boiler Structur Unit 15 | 209.0 | 200.0 | 12.0 | Unknown | Unknown | Unknown |
| Boiler Structure Unit 25 | 398.0 | 200.0 | 12.0 | Unknown | Unknown | Unknown |
| Boiler Structure Unit 35 | 343.0 | 200.0 | 12.0 | Unknown | Unknown | Unknown |
| Boiler Structure Unit 45 | 247.0 | 200.0 | 12.0 | Unknown | Unknown | Unknown |
| Valves and Piping in the Boilers and Generator Building2 | 852.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| Control Room for Boiler Units 3 & 4 (Building G)5 | 45.0 | 5,250.0 | 315.0 | Unknown | Unknown | Unknown |
| Control Room for Boiler Units 1 & 2 (Building H)5 | 45.0 | 5,250.0 | 315.0 | Unknown | Unknown | Unknown |
| Holly Oil Drum Storage Rack | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Acid & Caustic Tanks | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| South Oil / Water Separator | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Former Materials Storage | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Former Oil Heater | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Former Oil Heater | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Former Oil Heater | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| SUBTOTAL | 4,566.2 | 24,489.0 | 1,427.6 | 147.7 | 3.5 | 0.0 |
| Estimated recoverable material from equipment if not sold2 | 13,640.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| TOTAL | 18,206.2 | 24,489.0 | 1,427.6 | 147.7 | 3.5 | 0.0 |
| Hazardous Materials Storage Building (former Guard House at Haskell Street)3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Main Oil/Water Separator3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Emissions Module (Building K)1 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Warehouse and Maintenance Shop (Building W)3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Water Intake Structures Units 1, 2, 3, and 43 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Diesel Generator Building | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Holly Switchyard3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Weston Field Office3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Austin Energy Laboratory Service (AELS) Bldg. B3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| AELS Annex Bldg. E3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Guard House at Holly St. Entrance/Exit3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Entry Gate and Exit Gate3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Pedernales Substation3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Administration Building (Building X)3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |
| Chillers, their Foundation, Pipe Racks3 | Unknown | Unknown | Unknown | Unknown | Unknown | Unknown |